Home / Thông tin dự án / Dự án đầu tư / Projects Calling Investment In Ho Chi Minh City until 2020

Projects Calling Investment In Ho Chi Minh City until 2020

191 PROJECTS

NATIONAL KEY PROJECTS

1.  Project type:

Infrastructure – Bridges – Roads

2.  Project title:

Constructing aerial road – line 1 (along Nhiêu Lộc Canal–Thị Nghè, from Lăng Cha Cả to Thị Nghè bridge)

3. Location:

District 1, District 3, Tân Bình District, Bình Thạnh District, Phú Nhuận District

4.  Total land use area:
5. Project objectives:

Creating additional corridors along the North-South axis to reduce traffic pressures on the central area and connecting Tân Sơn Nhất airport with the center of the city.

6. The expected investment capital: VND 13,230 billion (equivalent to US$ 601 million)
7. General information on the project

Construction scale:

+ Road length: 10.8 km

+ Road width: 16.5 m

Decision No. 631/QĐ-TTg of the Prime Minister: Issuing the List of National Projects Calling for Foreign Investment until 2020

8. Form of investment: BOT or BOT combined with BT (BOT should be prioritized)
9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451

 

1.  Project type:

Infrastructure – Bridges – Roads

2.  Project title:

Constructing aerial road – line 2 (from the intersections of line 1 at Tô Hiến Thành – Lữ Gia – Bình Thới roads – Road No. 3 to Ring road 2)

3. Location:

District 10 and 11, and Bình Chánh District

4.  Total land use area:
5.  Project objectives:

Constructing radial aerial road running from central area to the West of the city.

6. The expected investment capital: VND 15,843 billion (equivalent to US$ 720 million)
7. General information on the project

Construction scale:

+ Length: 10.2 km,

+ Width: 17.5 m.

Decision No. 631/QĐ-TTg of the Prime Minister: Issuing the List of National Projects Calling for Foreign Investment until 2020

8. Form of investment: BOT or BOT combined with BT (BOT should be prioritized)
9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451

 

1.  Project type:

Infrastructure – Bridges – Roads

2.  Project title:

Constructing aerial road – line No. 3:(from the line No. 2 in Tô Hiến Thành – Lê Hồng Phong – Lý Thái Tổ – Nguyễn Văn Cừ – North-South Axis – Nguyễn Văn Linh)

3. Location:

District 5, 7 and 10

4.  Total land use area:
5. Project objectives:

Constructing radial aerial road to connect the central area to the South of the city.

6. The expected investment capital: VND 11,000 billion (equivalent to US$ 500 million)
7. General information on the project

Construction scale:

+ Length 7,3 km,

+ Width 16.5 m.

Decision No. 631/QĐ-TTg of the Prime Minister: Issuing the List of National Projects Calling for Foreign Investment until 2020

8. Form of investment: BOT or BOT combined with BT (BOT should be prioritized)
9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451

 

1.  Project type:

Infrastructure – Bridges – Roads

2.  Project title:

Constructing aerial road line 4 (Starting from high way 1 (intersecting with line 5) – Vườn Lài – crossing Vàm Thuật River at Lăng canal and North South railways (at Đen bridge) – planned Phan Chu Trinh road extends beyond Mỹ Phước apartment buildings and joins Điện Biên Phủ road, which intersects with line 1)

3. Location:

District 3, District 12, Bình Thạnh District and Gò Vấp District

4.  Total land use area:
5. Project objectives:

Constructing a high-above radial axis from the central area toward the North of the city.

6. The expected investment capital: VND 15,000 billion (equivalent to US$ 682 million)
7. General information on the project

Length: 7.3km, Cross section: 17.5m.

Decision No. 631/QĐ-TTg of the Prime Minister: Issuing the List of National Projects Calling for Foreign Investment until 2020

8. Form of investment: BOT or BOT combined with BT (BOT should be prioritized)
9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451

10. NB:

Estimated expense for compensation of land clearance: VND 5,300 billion.

 

1.  Project type:

Infrastructure – Bridges – Roads

2.  Project title:

Construction of aerial road, line 5 (coincides with ring road 2 (national highway 1) from the intersection of Station 2 to An Lạc intersection)

3. Location:

Thủ Đức District, District 12, Hóc Môn District, Tân Bình District.

4.  Total land use area:
5. Project objectives:

Constructing aerial ring road to improve the ability of connecting aerial road system of the city.

6. The expected investment capital: VND 97.651 billion (equivalent to US$ 4.439 million)
7. General information on the project

Length: 34km, Cross section: 18.5m

Decision No. 631/QĐ-TTg of the Prime Minister: Issuing the List of National Projects Calling for Foreign Investment until 2020

8. Form of investment: BOT or BOT combined with BT (BOT should be prioritized)
9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451

 

1. Project type:

Infrastructure – Urban railways

2.  Project title:

Ground tram line No.1

3. Location:

District 1, 5, 6, Bình Tân

4.  Total land use area:
5. Project objectives:

Providing transportation services with large carriage capacity, which improves safety and lowers environmental pollution

6. The expected investment capital: VND 5,325 billion (equivalent to US$ 242 million)
7. General information on the project

Direction: Ba Son – Tôn Đức Thắng – Mê Linh School gate – Võ Văn Kiệt – Lý Chiêu Hoàng – Miền Tây bus station

+ Total length: appx. 12.8km (on ground).

+ Number of stations: 6 main stations and 17 stops.

+ Depot at Western bus station with an area of 2.1 hectares.

Decision No. 631/QĐ-TTg of the Prime Minister: Issuing the List of National Projects Calling for Foreign Investment until 2020

8. Form of investment: ODA, PPP, etc.
9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451

10. NB:

Currently, the Department of Transportation and Communication is studying to implement the bus rapid transit (BRT) line funded by the World Bank pending reexamination of Tramway line 1 project. In the future, the line will extend from Ba Son to Bình Quới (Thanh Đa – Bình Thạnh) Tourist Site.

 

1.  Project type:

Infrastructure – Urban railways

2.  Project title:

Monorails No. 2: Highway 50 – Nguyễn Văn Linh – Trần Não – Parallel with Hà Nội Highway – Thảo Điền – Bình Quới

3. Location:

District 2, District 8, Thanh Đa – Bình Thạnh

4.  Total land use area:
5. Project objectives:

Providing transportation services with large carriage capacity, which improves safety and lowers environmental pollution

6. The expected investment capital: VND 15,230 billion (equivalent to US$ 692 million)
7. General information on the project

Decision No. 631/QĐ-TTg of the Prime Minister: Issuing the List of National Projects Calling for Foreign Investment until 2020

Direction: Highway 50 (Dist 8) – Nguyễn Văn Linh – Trần Não – Xuân Thủy- Bình Quới Urban Area, expected to connect the urban road No. 3a

Length: 27.2km

8. Form of investment: ODA, PPP, etc.
9. Contact address:

Urban Railway Project Management Board

Address: 29 Lê Quý Đôn, Ward 7 District 3, Hồ Chí Minh City

Tel: (08)3930.9495 – (08)3930.9496

Fax: (08)3930.9497 – (08)3930.9498

 

1.  Project type:

Infrastructure – Urban railways

2.  Project title:

Monorails No. 3: Bến Thành – Thủ Thiêm và Tham Lương – Tây Ninh coach station

3. Location:

Crossroad 6 of Gò Vấp – Tân Thời Hiệp Station

4.  Total land use area:
5. Project objectives:

Providing transportation services with large carriage capacity, which improves safety and lowers environmental pollution

6. The expected investment capital: VND 8,520 billion (equivalent to US$ 387 million)
7. General information on the project

Decision No. 631/QĐ-TTg of the Prime Minister: Issuing the List of National Projects Calling for Foreign Investment until 2020

Direction from the crossroad (Phan Văn Trị – Nguyễn Oanh)- Quang Trung – Quang Trung Software Park – Tô Kỳ- Tân Chánh Hiệp Station

Length: 16.5 km

8. Form of investment: ODA, PPP, etc.
9. Contact address:

Urban Railway Project Management Board

Address: 29 Lê Quý Đôn, Ward 7 District 3, Hồ Chí Minh City

Tel: (08)3930.9495 – (08)3930.9496

Fax: (08)3930.9497 – (08)3930.9498

 

1.  Project type:

Infrastructure – Urban railways

2.  Project title:

Metro road No. 6 (Bà Quẹo – Phú Lâm)

3. Location:

District 11 and Tân Bình District

4.  Total land use area:
5. Project objectives:

Providing public transportation services with large carriage capacity, which is safety and lowers environmental pollution

6. The expected investment capital: VND 27,930 billion (equivalent to US$ 1,270 million)
7. General information on the project

Length: 6.7 km, running under the ground from Trường Chinh, Âu Cơ, Lũy Bán Bích to Phú Lâm round abound; 7 underground stations.

Decision No. 631/QD-TTg of the Prime Minister: Issuing the List of National Calling for Foreign Investment until 2020

8. Form of investment: ODA, PPP, etc.
9. Contact address:

Urban Railway Project Management Board

Address: 29 Lê Quý Đôn, Ward 7 District 3, Hồ Chí Minh City

Tel: (08)3930.9495 – (08)3930.9496

Fax: (08)3930.9497 – (08)3930.9498

10. NB:

The project documents are under completion.

 

1.  Project type:

Infrastructure – Environment – Waste treatment

2.  Project title:

Hazardous industrial solid wastes treatment zone in Northwest of Củ Chi

3. Location:

HCMC

4.  Total land use area: 100 ha
5. Project objectives:
6. The expected investment capital: VND 954 billion (equivalent to US$ 43 million)
7. General information on the project

Decision No. 631/QĐ-TTg of the Prime Minister: Issuing the List of National Projects Calling for Foreign Investment until 2020

8. Form of investment: Joint venture
9. Contact address:

Infrastructure Department, Ministry of Construction, 37 Lê Đại Hành, Hà Nội

 

1.   Project type: Education
2.   Project title:

Residential area and International University

3. Location:

Hóc Môn District

4.  Total land use area: 930 ha
5. Project objectives:

Building the university and residential area in accordance with international standards, providing graduate and post graduate education. 74 3,50

6. The expected investment capital: VND 74 billion (equivalent to US$ 3 million)
7. General information on the project

Decision No. 631/QĐ-TTg of the Prime Minister: Issuing the List of National Projects Calling for Foreign Investment until 2020

8. Form of investment: 100 FDI
9. Contact address:

City Northwest Urban Construction Investment Management Board  – 86 Lê Thánh Tôn Quận 1

 

1.    Project type: Health
2.    Project title:

Hospitals in the Medical System of Tân Kiên – Bình Chánh

3. Location:

Tân Kiên and Tân Nhựt Commune, Bình Chánh District, HCMC

4.  Total land use area: 73 ha
5. Project objectives:

Building general and specialty hospitals, as well as other healthcare facilities in Tân Kiên – Bình Chánh medical system with a scale from 54 to 73 hectares to establish medical institutions and schools in developed countries’ standards, meeting the needs of training personnel in medical, research and diplomatic fields; at the same time providing diagnoses and treatments for patients in the city and nearby areas, offloading for central hospitals.

6. The expected investment capital: VND 10,600 billion (equivalent to US$ 482 million)
7. General information on the project

The People’s Committee of the city has approved the Zoning planning task of 1/2,000 scale for 54 hectare land area. The People’s Committee of Bình Chánh Dist. Is providing clearance compensation, which is expected to complete by 2014 and Decision No. 631/QĐ-TTg of the Prime Minister: Issuing the List of National Projects Calling for Foreign Investment until 2020

8. Form of investment: FDI and other forms proposed by the Investor…
9. Contact address:

Department of Health                      

Address: 59 Nguyễn Thị Minh Khai, Bến Nghé Ward, District 1, Hồ Chí Minh City,

_ Represented by: Mr. Lê Anh Tuấn

_ Position: Department’s Chief of Office

_ Tel: (08)39309912

_ Fax: (08)39307035

_ Email: syt@tphcm.gov.vn

PROJECTS CALLING FOR INVESTMENT UNDER THE FORM OF SOCIALIZATION

 

1.  Project type: Bridge – road
2.  Project title:

Constructing high line No. 1

3. Location:

District 1, District 3, Tân Bình District, Bình Thạnh District, Phú Nhuận District

4.  Total length: about 9,5 km
5. Project objectives:

Creating more corridor along the North-South axis to decrease pressure on the traffic at the central area, connecting Tân Sơn Nhất airport with the city centre

6. The expected investment capital: VND 15,460 billion (equivalent to US$ 703 million)
7. General information on the project

Under Decision no. 568/QD-TTg, the direction of the highway no. 1 is fixed as follows: the highway starts from Cộng Hòa -Trường Chinh interchange, and goes along roads named Cộng Hòa – Trần Quốc Hoàn – Phan Thúc Duyên – Hoàng Văn Thụ – Phan Đăng Lưu – Phan Xích Long – Phan Xích Long (extended, standby) – crosses Điện Biên Phủ road. Here, the line has 01 branch for exit/entry at the interchange of Điện Biên Phủ road, and another branch will be extended to Ngô Tất Tố road – then end before Phú An bridge. Length: ~ 9.5 km.

8. Form of investment: PPP, ODA.
9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451

10. NB:

General plan has already been available

 

1.  Project type: Bridge – road
2.  Project title:

Constructing high line No. 2

3. Location:

District 10, District 11, Bình Chánh District

4.  Total length: about 11,8 km
5. Project objectives:

Constructing a high-above radial axis from the central area toward the West of the city

6. The expected investment capital: VND 21,490 billion (equivalent to US$ 977 million)
7. General information on the project

Under Decision no. 568/QD-TTg, the direction of the highway no. 2 is fixed as follows: crosses highway no. 1 at the interchange of Cha Cả Mausoleum, then goes along Bùi Thị Xuân road, cross Nhiêu Lộc – Thị Nghè Canal at bridge no. 5, goes along hamlet no. 656 Cách Mạng Tháng Tám, through Bắc Hải road – hamlet no. 2 Thiên Phước road – hamlet no. 654 Âu Cơ road – along Đầm Sen park – Bàu Trâu ditch, goes along Bàu Trâu ditch (border between District 6 and Tân Phú District), pass Phan Anh road and Tân Hòa Đông road to turn into Chiến Lược road, goes along Chiến Lược road to Mã Lò road before turning into Inter-village road no. 2 and ends at the interchange of NH 1 (Belt road no. 2). The Line No. 2 is about 11.8 km long, passing Districts 3, 6, 10, 11, Tân Bình, Bình Tân.

8. Form of investment: PPP, ODA.
9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451

10. NB:

General plan has already been available

 

1.  Project type: Bridge – road
2.  Project title:

Constructing high line No. 3

3. Location:

District 5, District 7, District 10

4.  Total length: about 8,1 km
5. Project objectives:

Constructing a high-above radial axis from the central area toward the South of the city

6. The expected investment capital: VND 14,756 billion (equivalent to US$ 671 million)
7. General information on the project

Under Decision No. 568/QD-TTg, the direction of the highway No. 3 is fixed as follows: from the interchange of the highway No. 2 at Thành Thái road, the highway goes along Thành Thái road, passes Tô Hiến Thành road. Then, continue going along Thành Thái road to Thành Thái intersection and 3 Thang 2 road, turns left into Lý Thái Tổ road to Lý Thái Tổ 7-intersection; from Lý Thái Tổ 7-intersection, the highway coincides with roads Lý Thái Tổ – Nguyễn Văn Cừ to Nguyễn Văn Cừ – Trần Hưng Đạo intersection. From Nguyễn Văn Cừ – Trần Hưng Đạo intersection, the highway goes along Nguyễn Văn Cừ for about 100m then turns left along Nguyễn Văn Cừ road, passes Võ Văn Kiệt avenue, Bến Nghé ditch and Kênh Tẻ ditch, goes along the right bank of Ông Lớn ditch for about 450m. From here the highway goes along Ông Lớn ditch to nearly Ông Lớn bridge then merges into the main axis road of Trung Sơn area (road 9A) to connect into Nguyễn Văn Linh road. Length: ~ 8.1km.

8. Form of investment: PPP, ODA.
9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451

10. NB:

General plan has already been available

 

1.  Project type: Bridge – road
2.  Project title:

Constructing high line No. 4

3. Location:

District 3, District 12, Bình Thạnh District and Gò Vấp District

4.  Total length: about 7,3 km
5. Project objectives:

Constructing a high-above radial axis from the central area toward the North of the city

6. The expected investment capital: VND 20,300 billion (equivalent to US$ 923 million)
7. General information on the project

Under Decision No. 568/QD-TTg, the direction of the highway no. 4 is fixed as follows: starts from NH 1 (crosses the highway no. 5), the highway goes along Vườn Lài road, crosses Vàm Thuật river at Lang ditch and North-South railway (at Đen Bridge), next, the highway goes along Phan Chu Trinh road and planned to extend and pass by Mỹ Phước condominium, ends by crossing highway No. 1 at Điện Biên Phủ road. Total length: about 7.30 km.

8. Form of investment: PPP, ODA.
9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451

10. NB:

General plan has already been available

 

1.   Project type: Bridge – road
2.   Project title:

Upgrading and expanding An Dương Vương – Phan Anh – Bình Long – Hương Lộ 3 road system

3. Location:

District 6, 8, Bình Tân and Tân Phú

4.  Total length:
5. Project objectives:

Enhancing traffic ability

6. The expected investment capital: VND 10,000 billion (equivalent to US$ 455 million)
7. General information on the project

Decision No. 5754/QĐ-UBND dated 12/11/2012 of the People’s Committee of the city on approving the portfolio of investment projects under BOT and BT form in the city

Investment scale:

– Length: 10.65 km;

– Cross section: 6 lanes, limit: 30m.

8. Form of investment: BT
9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451

 

1. Project type: Bridge – road
2. Project title:

Enhancement and expansion of Provincial Highway 15 (from the North West of Tân Chánh Hiệp – Ngã Ba Bàu intersection), Dist.12

3. Location:

District 12 and Củ Chi District

4.  Total length:
5. Project objectives:

Perfecting the local traffic system, contributing to the economic – social development of the area across Provincial Highway 15.

6. The expected investment capital: VND 1,999 billion (equivalent to US$ 91 million)
7. General information on the project

Decision No. 5754/QĐ-UBND dated 12/11/2012 of the People’s Committee of the city on approving the portfolio of investment projects under BOT and BT form in the city

Total length 11.9km, Cross section 35m (06 lanes + 3m long median strips + 2×3.75m of pavement).

8. Form of investment: BOT, BOT combined with BT (BOT should be prioritized)
9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451

 

1. Project type: Bridge – road
2. Project title:

Upgrading and Repairing Đặng Thúc Vịnh road (provincial highway 9)

3. Location:

Hóc Môn District

4.  Total length:
5. Project objectives:

Resolving traffic issues, solidifying and developing traffic infrastructures in Hóc Môn District

6. The expected investment capital: VND 1,813 billion (equivalent to US$ 82 million)
7. General information on the project

Decision No. 5754/QĐ-UBND dated 12/11/2012 of the People’s Committee of the city on approving the portfolio of investment projects under BOT and BT form in the city

5.200m x 40m

8. Form of investment: BT
9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451

 

1. Project type: Bridge – road
2. Project title:

Construction of connecting road from Eastern ring road – Hanoi highway (Bình Thái road – Eastern ring road

3. Location:

District 9, Thủ Đức District.

4.  Total length:
5. Project objectives:

Completing the regional traffic system. Enhancing traffic ability in the city’s Eastern gateway.

6. The expected investment capital: VND 1,581 billion (equivalent to US$ 72 million)
7. General information on the project

Decision No. 5754/QĐ-UBND dated 12/11/2012 of the People’s Committee of the city on approving the portfolio of investment projects under BOT and BT form in the city

Total length: 3,820m, Cross section 67m (stage 1: constructing two side roads, each includes 02 lanes + 33m for reservation in between).

8. Form of investment: BT, PPP and other feasible forms of investment.
9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451

10. NB:

Estimated expense for compensation of land clearance is about VND 2000 billion, the Department of Transportation and Communication of Hồ Chí Minh City is organizing the appraisal of the project.

 

1.  Project type: Bridge – road
2.  Project title:

Upgrading and expanding Provincial Highway 15 (from Highway 7 Bridge to Bến Súc bridge)

3. Location:

Củ Chi District.

4.  Total length:
5. Project objectives:

Perfecting the local traffic system, contributing to the economic – social development of the area across Provincial Highway 15.

6. The expected investment capital: VND 1,536 billion (equivalent to US$ 70 million)
7. General information on the project

Decision No. 5754/QĐ-UBND dated 12/11/2012 of the People’s Committee of the city on approving the portfolio of investment projects under BOT and BT form in the city

Length: 10.58km, Cross section 35m (06 lanes + 3m median strips + 2×3.75m pavement).

8. Form of investment: BOT, BOT combined with BT (BOT should be prioritized)
9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451

10. NB:

Estimated expense for compensation of land clearance is about VND 999.81 billion.

 

1.  Project type: Bridge – road
2.  Project title:

Upgrading and expanding Provincial Highway 15 in Củ Chi province (from Xáng bridge to Bến Súc bridge)

3. Location:

Củ Chi District.

4.  Total length:
5. Project objectives:

Perfecting the local traffic system, contributing to the economic – social development of the area across Provincial Highway 15

6. The expected investment capital: VND 6000 billion (equivalent to US$ 2703 million)
7. General information on the project

Decision No. 5754/QĐ-UBND dated 12/11/2012 of the People’s Committee of the city on approving the portfolio of investment projects under BOT and BT form in the city

Total length: 35km. Cross section: 35m (including 06 lanes + 3m median strips + 2 lanes x 3.75m).

8. Form of investment: BOT, BOT combined with BT (BOT should be prioritized)
9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451

 

1.  Project type: Bridge – road
2.  Project title:

Constructing a road in parallel with Nguyễn Văn Tạo road

3. Location:

Nhà Bè District

4.  Total length:
7. Project objectives:

Meeting the need of transport and urbanization development in Hiệp Phước Harbor Industrial and Urban Zone

5. The expected investment capital: VND 1,200 billion (equivalent to US$ 55 million)
8. General information on the project

Decision No. 5754/QĐ-UBND dated 12/11/2012 of the People’s Committee of the city on approving the portfolio of investment projects under BOT and BT form in the city

Investment scale:

– Road length: 4.5km

– Cross section: 60m

6. Form of investment: BT (mainly mining soil)
8. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451

 

1.  Project type: Bridge – road
2.  Project title:

Upgrading and expanding Provincial Highway 9

3. Location:

Củ Chi District

4.  Total length:
5. Project objectives:

Enhancing traffic ability

6. The expected investment capital: VND 1,200 billion (equivalent to US$ 55 million)
7. General information on the project

Decision No. 5754/QĐ-UBND dated 12/11/2012 of the People’s Committee of the city on approving the portfolio of investment projects under BOT and BT form in the city

Investment scale:

– Road length: 5.7 km

– Cross section: 40m

8. Form of investment: BT
9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451

 

1.  Project type: Bridge – road
2.  Project title:

Constructing the Northwestern radial road (from Long An dike to Vĩnh Lộc industrial zone)

3. Location:

Bình Tân District, Bình Chánh District

4.  Total length:
5. Project objectives:

Completing the regional traffic system.

6. The expected investment capital: VND 5,000 billion (equivalent to US$ 227 million)
7. General information on the project

Decision No. 5754/QĐ-UBND dated 12/11/2012 of the People’s Committee of the city on approving the portfolio of investment projects under BOT and BT form in the city

total leng: 8km

8. Form of investment: BT (mainly exploiting land fund)
9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451

 

1.  Project type: Bridge – road
2.  Project title:

Constructing Ba Diem Cross-road (Highway No. 1 and Phan Văn Hớn Road)

3. Location:

District 12, Hóc Môn District

4.  Total length:
5.  Project objectives:

Addressing the traffic congestion at the intersection

6.  The expected investment capital: VND 408 billion (equivalent to US$ 19 million)
7.  General information on the project

Building a crossover in the direction of Highway 1, which is 246m long and 18.6m wide

8.  Form of investment: BT (mainly exploiting land fund)
9.   Contact address:

Urban Traffic Control Section No. 3

 

1.  Project type: Bridge – road
2.  Project title:

Constructing Nguyễn Văn Linh Intersection – Highway 1A, Bình Chánh District

3. Location:

Bình Chánh District

4.  Total length:
5. Project objectives:

Constructing Nguyễn Văn Linh intersection – Highway 1A in order to satisfy traffic needs in the area

6. The expected investment capital: VND 775 billion (equivalent to US$ 35 million)
7. General information on the project

– HC1 underpass on Nguyễn Văn Linh Street – in the direction from Nguyễn Văn Linh  Street – Highway 1A to Tân Thuận Export Processing Zone

– HC2 underpass on Nguyễn Văn Linh  Street – toward Tân Thuận EPZ via Saigon – Trung Lương Highway

– Constructing the central roundabout.

8. Form of investment:
9. Contact address:

Urban Traffic Control Section No. 4

 

1.  Project type: Bridge – road
2.  Project title:

Constructing Nguyễn Văn Linh  intersection – Highway 50, Bình Chánh District

3. Location:

Bình Chánh District

4.  Total length:
5. Project objectives:

Constructing Nguyễn Văn Linh intersection – Highway 50 in order to satisfy traffic needs in the area

6. The expected investment capital: VND 738 billion (equivalent to US$ 34 million)
7. General information on the project
8. Form of investment:
9. Contact address:

Urban Traffic Control Section No. 4

 

1.  Project type: Bridge – road
2.  Project title:

Constructing Nguyễn Văn Linh intersection – Phạm Hùng, Bình Chánh

3. Location:

Bình Chánh District

4.  Total length:
5. Project objectives:

Constructing Nguyễn Văn Linh intersection – Phạm Hùng in order to satisfy traffic needs in the area

6. The expected investment capital: VND 753 billion (equivalent to US$ 34 million)
7. General information on the project

– HC1 underpass on Nguyễn Văn Linh Street – in the direction from Nguyễn Văn Linh  Street – Highway 1A to Tân Thuận Export Processing Zone

– HC2 underpass on Nguyễn Văn Linh Street – toward Tân Thuận EPZ via National Highway 1A

– Constructing the central roundabout.

8. Form of investment:
9. Contact address:

Urban Traffic Control Section No. 4

 

1.  Project type: Bridge – road
2.  Project title:

Constructing Nguyễn Văn Linh intersection – Nguyễn Lương Bằng Street, District 7

3. Location:

District 7

4.  Total length:
5. Project objectives:

Constructing Nguyễn Văn Linh intersection – Nguyễn Lương Bằng in order to satisfy traffic needs in the area

6. The expected investment capital: VND 783 billion (equivalent to US$ 36 million)
7. General information on the project

– HC1 underpass on Nguyễn Văn Linh Street – in the direction from Nguyễn Văn Linh  Street – Highway 1A to Tân Thuận Export Processing Zone

– HC2 underpass on Nguyễn Văn Linh Street – toward Tân Thuận EPZ via National Highway 1A

– Constructing the central roundabout.

8. Form of investment:
9. Contact address:

Urban Traffic Control Section No. 4

 

1.  Project type: Bridge – road
2. Project name:

Constructing the inter-ward road Thới An – Thanh Xuân (line 1)

3. Location:

District 12

4.  Total length:
5. Project objectives:

– The inter-ward road line of Thới An – Thạnh Xuân (line 1) after completion will promote the urbanization process, contributing to the redistribution of urban population, promoting social-economic development. In addition, it regulates and redistributes the existing traffic flow, reducing traffic density on Highway 1 from Bình Phước intersection to Ga Intersection.

– Developing transport network in District 12, making the connection as well as convenient travel for the residents of the area of District 12 and District 12.

6. The expected investment capital: VND 1,268 billion (equivalent to US$ 58 million)
7. General information on the project

L = 3,393m B = 30m

8. Form of investment:
9. Contact address:

Urban Traffic Control Section No. 3

 

1.  Project type: Bridge – road
2. Project name:

Expanding and upgrading Nguyễn Oanh Road, Hà Huy Giáp Road (from Phan Văn Trị Street to Ga Intersection overpass)

3. Location:

District 12, Gò Vấp

4.  Total length:
5. Project objectives:

Ensuring traffic safety, solving traffic jam, improving efficiency of operation and serving better the movement of people.

6. The expected investment capital: VND 1,310 billion (equivalent to US$ 60 million)
7. General information on the project

3.5km x 30m; building the new bridge of An Loc

8. Form of investment:
9. Contact address:

Urban Traffic Control Section No. 3

 

1.   Project type: Bridge – road
2.  Project title:

Expanding and upgrading Nguyễn Kiệm Road

3. Location:

Gò Vấp District

4.  Total length:
5. Project objectives:

Ensuring traffic safety, tackle traffic jam, enhance operation capacity of the route and gentrification.

6. The expected investment capital: VND 806 billion (equivalent to US$ 37 million)
7. General information on the project

Expanding pavement (30) m wide, 1.3km long

8. Form of investment:
9. Contact address:

Urban Traffic Control Section No. 3

 

1.  Project type: Bridge – road
2. Project name:

Expanding and upgrading Dương Quảng Hàm Street (the section from the Culture Park to the Reunification Road)

3. Location:

Gò Vấp District

4.  Total length:
5. Project objectives:

– It is the East-West Transport Axis, both resolving internal transport and connecting the inner city with the provinces of Bình Dương, Tây Ninh (to the trans-Asian road)

– Combining gentrification, investing to construct apartment buildings, commercial and service buildings on both sides. Contributing to improvement of infrastructure and urban landscape, increasing the housing fund for the City

6. The expected investment capital: VND 663 billion (equivalent to US$ 30 million)
7. General information on the project

L = 2600 m

B = 40 m

8. Form of investment:
9. Contact address:

Urban Traffic Control Section No. 3

 

1.  Project type: Bridge – road
3.  Project title:

Expanding and upgrading Dương Quảng Hàm Street (the section from the Reunification road to Truong Dai Bridge).

3. Location:

Gò Vấp District

4.  Total length:
7. Project objectives:

– It is the East-West Transport Axis, both resolving internal transport and connecting the inner city with the provinces of Bình Dương, Tây Ninh (to the trans-Asian road)

– Combining gentrification, investing to construct apartment buildings, commercial and service buildings on both sides. Contributing to improvement of infrastructure and urban landscape, increasing the housing fund for the City

5. The expected investment capital: VND 448 billion (equivalent to US$ 20 million)
8. General information on the project

L = 1800 m

B = 40 m

6. Form of investment:
8. Contact address:

Urban Traffic Control Section No. 3

 

1.  Project type: Bridge – road
4.  Project title:

Upgrading and expanding Hồ Học Lãm Street, District 8 and Bình Tân District

3. Location:

District 8, Bình Tân

4.  Total length:
7. Project objectives:

Upgrading and expanding Hồ Học Lãm Street to meet the transportation needs of the area, solving the inundation in the area, doing the gentrification, gradually closing the Ring Road 2 at the West of the city

5. The expected investment capital: VND 980 billion (equivalent to US$ 45 million)
8. General information on the project

– The length of the line is 1.500 m

– The cross-section of the road is about 42m wide.

6. Form of investment:
8. Contact address:

Urban Traffic Control Section No. 4

 

1.  Project type: Bridge – road
5.  Project title:

Expanding, upgrading Nguyễn Văn Nghi road (section from Nguyễn Thái Sơn road to Gò Vấp 6-intersection)

3. Location:

Gò Vấp District

4.  Total length:
7. Project objectives:

Ensuring traffic safety, solving traffic jams in the local area

5. The expected investment capital: VND 479 billion (equivalent to US$ 22 million)
8. General information on the project

Length: 750m

Cross-section: 25m.

Pavement structure and related technical works: asphalt concrete, improvement of sidewalk drainage system

6. Form of investment:
8. Contact address:

Urban Traffic Control Section No. 3

 

1.  Project type: Bridge – road
6.  Project title:

Constructing traffic point Warehouse B on Nguyễn Hữu Thọ road

3. Location:

Nhà Bè District

4.  Total length:
7. Project objectives:

Ensuring traffic safety, solving traffic jams in the local area

5. The expected investment capital: VND 800 billion (equivalent to US$ 36 million)
8. General information on the project

Length: 436m; of which, bridge length: 286m; length of roads at two bridge sides: 150m. Bridge size: 48m

6. Form of investment:
8. Contact address:

Urban Traffic Control Section No. 4

 

1.  Project type: Bridge – road
2.  Project title:

Traffic point at the beginning of access road into An Hạ bridge

3. Location:

Northwest zone

4.  Total land area: 12.39 ha
7. Project objectives:

Investing in infrastructure under the approved planning, facilitating the development of the North-Western Urban Area

5. The expected investment capital: VND 600 billion (equivalent to US$ 27 million)
8. General information on the project

Already approved by the City People’s Committee in the list of investment projects in form of BT at Decision No. 5754/QD-UBND dated 12/11/2012

6. Form of investment: PPP- BT contracts
8. Contact address:

North-Western Urban Area Management Board

 

1.  Project type: Bridge – road
3.  Project title:

Constructing Tam Tân road

3. Location:

Northwest zone

4.  Total land area: 49.99 ha
7. Project objectives:

Investing in infrastructure under the approved planning, facilitating the development of the North-Western Urban Area

5. The expected investment capital: VND 6,110 billion (equivalent to US$ 278 million)
8. General information on the project

Already approved by the City People’s Committee in the list of investment projects in form of BT at Decision No. 5754/QD-UBND dated 12/11/2012. Current land status: not yet finished in land compensation and clearance

6. Form of investment: PPP- BT contracts
8. Contact address:

North-Western Urban Area Management Board

 

1.  Project type: Bridge – road
2.  Project title:

Constructing radial roads connecting Đồng Văn Cống road to Belt road no. 2 (Inter-ward road No.1)

3. Location:

District 2

4.  Total land area:

–         Phase 1: 60,827m2;

–         Phase 2: 72,900 m2

7. Project objectives:

Investing in infrastructure under the approved planning, facilitating the development of the North-Western Urban Area

5. The expected investment capital: VND 200 billion (equivalent to US$ 9 million)
8. General information on the project

_ City road, designed road grade 60km/h

_ Length: 2,240m;

_ Width: 30m

6. Form of investment: BT
8. Contact address:
9. NB:

Application has been lodged for the approval of making project proposal

 

1.     Project type: Bridge – road
2.     Project title:

Constructing the Metro Line No. 2 (the Bến Thành  -Thủ Thiêm Section and Tham Lương – Tây Ninh Station – Urban Tây Bắc Củ Chi Area Section

3.   Location:

Districts 01, 02, 12, Củ Chi District and Hóc Môn District.

4.  Total land area:

–            Total length: 48km.

–            Section Bến Thành – Thủ Thiêm: 5.91 km

–            Section Tham Lương – Tây Ninh Depot: 3.2 km

–            Section Tây Ninh Depot – the North-Western Urban Area Củ Chi: 28 km and Hiệp Phước depot.

5. Project objectives:

The Project is to construct a system of urban railways, under the general planning of the city, in connecting with other public traffic system in the city and other commercial services, providing public transport services with big capacity, safety and friendly to environment.

6. The expected investment capital: VND 18,321 billion (equivalent to US$ 833 million)
7. General information on the project

– National key projects.

– Section Bến Thành – Thủ Thiêm and section Tham Lương- Tây Ninh Depot under the project of Metro No. 2 (Thủ Thiêm- the North-Western Urban Area Củ Chi) including:

+ Section Bến Thành – Tham Lương.

+ Section Bến Thành – Thủ Thiêm and Tham Lương- Tây Ninh Depot

+ Section Tây Ninh Depot – the North-Western Urban Area Củ Chi.

– Under Decision no. 568/QD-TTg dated 08/04/2013 by the Prime Minister approving Planning for development of traffic and transport of Hồ Chí Minh City till 2020 and vision after 2020

+ Section Bến Thành- Thủ Thiêm: to extend the beginning point of Metro No.2 – section Bến Thành-Tham Lương, from Bến Thành station along Hàm Nghi road, crossing Sài Gòn river to Thủ Thiêm new urban area (under Decision No. 1556/QD-BGTVT dated 06/6/2013 of the Ministry of Transport approving the detailed plan for railways in the nodal area of Hồ Chí Minh City) with 6 stations.

+ Section Tham Lương- Tây Ninh Depot: to extend the ending point of Metro No. 2 – section Bến Thành – Tham Lương at

Tân Bình station, crossing Tham Lương Canal along Trường Chinh road, passing An Sương interchange and ending before Tây Ninh Depot, going overhead with 3 stations. Using Tham Lương depot together with Metro no. 2 (section Bến Thành -Tham Lương).

+ Section Tây Ninh Depot- the North-Western Urban Area Củ Chi: to extend the ending point of section Tham Lương – Tây Ninh Depot, about 700m from An Sương interchange to the North-West and ending at the North-Western Urban Area Củ Chi with 22 overhead stations. Hiệp Phước depot (Củ Chi) with area of 27.5 ha.

– Metro No. 2 will connect with Thủ Thiêm new urban area District 2 so the capacity to attract passengers to use this route will be very large; it’s easy to utilize stations along the route as trading centers.

8. Form of investment: PPP ( BOT, OBT combined with BT), ODA
9. Contact address:

Urban Railway Project Management Board

Address: 29 Lê Quý Đôn, Ward 7 District 3, Hồ Chí Minh City

Tel: (08)3930.9495 – (08)3930.9496

Fax: (08)3930.9497 – (08)3930.9498

10. NB:

– Bến Thành- Thủ Thiêm Section and Tham Lương – Tây Ninh Depot Section: It is expected to complete the pre-feasibility study report, set up the dossier for demarcation and deploy the field markers in the second quarter of 2016 and submit the National Assembly for approval of the investment policy and register with the Ministry of Planning and Investment to use ODA loans for the period of 2016-2020 for the project.

– The Tây Ninh Depot – the North-Western Urban Area of Củ Chi: It is expected that the making of the investment report is completed in 2016.

 

1.     Project type: Bridge – road
2.     Project title:

Constructing the Metro Line No. 3a (Bến Thành- Tân Kiên Station)

3.   Location:

Districts 1, 3, 5, 6, 10, 11, Bình Tân, Bình Chánh District

4.  Total land area:

–      Total length: 19.8 km.

–      Phase 01 (Bến Thành – existing Miền Tây Depot) of 9,7 km length

–      Phase 02 (Old Miền Tây Depot – Tân Kiên station) of about 10.1 km length and Tân Kiên depot.

5. Project objectives:

The Project is to construct a system of urban railways, under the general planning of the city, in connecting with other public traffic system in the city and other commercial services, providing public transport services with big capacity, safety and friendly to environment.

6. The expected investment capital: VND 66,444 billion (equivalent to US$ 3000 million)
7. General information on the project

– National key projects.

–  Under Decision No. 568/QD-TTg dated 08/4/2013 by the Prime Minister approving the adjustment of planning for development of traffic and transport of Hồ Chí Minh City till 2020 and vision after 2020:

+ Route direction: Bến Thành – Phạm Ngũ Lão – Cộng Hòa six-way intersection- Hùng Vương – Hồng Bàng – Kinh Dương Vương – Tân Kiên depot – Tân Kiên station.

+ Metro No. 3a has 17 stations (11 underground stations, 1 on-land station, 5 high-above stations).

+ The Project is expected to be divided into 02 phases:

• Phase 01 (Bến Thành – existing Miền Tây Depot): to go underground completely with 10 underground stations. Using Long Bình depot of Metro no.

• Phase 02 (Existing Miền Tây Depot – Tân Kiên station) and Tân Kiên depot : length: about 10.1 km with 7 stations, including 1 underground, 5 high-above stations and 01 on-land station. Tân Kiên depot at Bình Chánh District with area of 26.5 ha

– Oriented researches to extend the route No. 3a to connect to Tân An city (Long An province) from Hưng Nhơn station along NH 1.

8.  Form of investment:

– ODA, PPP (BOT, BOT combined with BT), etc.

– Formerly it was oriented to use preferential capital of the Government of Japan for the period of 2015-2017 according to the Official Letter No. 430/UBND-QLDA dated 23/01/2015.

9. Contact address:

Urban Railway Project Management Board

Address: 29 Lê Quý Đôn, Ward 7 District 3, Hồ Chí Minh City

Tel: (08)3930.9495 – (08)3930.9496

Fax: (08)3930.9497 – (08)3930.9498

10. NB:

– Phase 01 (Bến Thành – existing Miền Tây Depot) of 9.7 km long:

+ The City’s People’s Committee has approved the basic design. The demarcation and milestone documents have been approved and handed over to the local authority for planning management.

+ The project has been included in the list of projects using preferential loans of the Government of Japan, period of 2013-2015.

+ JICA has agreed to provide technical assistance to completely the project. It is expected that the project feasibility will be completed in late 2016, and in 2017 it will be submitted to the Prime Minister for ask the National Assembly for investment policy.

– Phase 02 (Old Miền Tây Depot – Tân Kiên station) of Tân Kiên depot.

+ Domestic consultant has completed the basic design.

+ In the future, the line will extend from Hưng Nhơn Station along NH 1 to Tân An City – Long An.

+ Currently, the Board is asking JICA for additional research together with the phase 1 of the project.

 

1.     Project type: Bridge – road
2.     Project title:

Constructing the Metro Line No. 3b (6-branch intersection Cộng Hòa – Hiệp Bình Phước)

3.   Location:

Districts 1, 3, 5, Bình Thạnh District and Thủ Đức District.

4.  Total land area:

–         12.1 km and Hiệp Bình Phước depot.

5. Project objectives:

The Project is to construct a system of urban railways, under the general planning of the city, in connecting with other public traffic system in the city and other commercial services, providing public transport services with big capacity, safety and friendly to environment.

6. The expected investment capital: VND 41,556 billion (equivalent to US$ 1,881million)
7. General information on the project

– National key projects.

–  Under Decision No. 568/QD-TTg dated 08/4/2013 by the Prime Minister approving the adjustment of planning for development of traffic and transport of Hồ Chí Minh City till 2020 and vision after 2020:

+ Route direction: Cộng Hòa 6-way intersection – Nguyễn Thị Minh Khai – Xô Viết Nghệ Tĩnh – NH13 – Hiệp Bình Phước.

+ Metro No. 3b includes 9.1 km of underground line (8 underground stations) and 3 km of overhead line (2 overhead stations).

+ Orienting researches to extend the route No. 3b to connect with Thủ Dầu Một township (Bình Dương province) from Hiệp Bình station along NH 13; connect with the urban railway No. 1 of Bình Dương province.

+ Depot at Hiệp Bình Phước, Thủ Đức District with area of 20 ha.

8.  Form of investment:

– Form of investment: ODA, PPP (BOT, OBT combined with BT).

– The project has been included in the list of projects using preferential loans of the Government of Japan, period of 2013-2015 (Official Letter No. 430/UBND-QLDA dated 23/01/2015 of the City’s People’s Committee).

9. Contact address:

Urban Railway Project Management Board

Address: 29 Lê Quý Đôn, Ward 7 District 3, Hồ Chí Minh City

Tel: (08)3930.9495 – (08)3930.9496

Fax: (08)3930.9497 – (08)3930.9498

10. NB:

– The City’s People’s Committee has approved the basic design. The demarcation and milestone documents have been approved and handed over to the local authority for planning management.

 

1.     Project type: Bridge – road
2.     Project title:

Constructing Metro Line No. 4 (Thanh Xuân – Hiệp Phước Urban Area)

3.   Location:

Districts 1, 3, 4, 7, 12, Gò Vấp, Phú Nhuận, and Nhà Bè District.

4.  Total land area:

–         36.2 km and Thạnh Xuân depot, Hiệp Bình Phước depot.

5. Project objectives:

The Project is to construct a system of urban railways, under the general planning of the city, in connecting with other public traffic system in the city and other commercial services, providing public transport services with big capacity, safety and friendly to environment.

6. The expected investment capital: VND 77,700 billion (equivalent to US$ 3,532 million)
7. General information on the project

– National key projects.

– Under Decision no. 568/QD-TTg dated 08/04/2013 by the Prime Minister approving the adjustment of planning for development of traffic and transport of HCMC till 2020 and vision after 2020.

+ Route direction: Thạnh Xuân (District 12) – Hà Huy Giáp – Nguyễn Oanh – Nguyễn Kiệm – Phan Đình Phùng – Hai Bà Trưng – Bến Thành – Nguyễn Thái Học – Tôn Đản – Nguyễn Hữu Thọ – Hiệp Phước Urban Area.

+ Metro No. 4 has 33 stations (2 on-land stations, 16 high-above stations, 15 underground stations).

+ The route has Thạnh Xuân depot with area of 27 ha at the Ward

Thạnh Xuân, District 12 and Hiệp Phước depot with area of 20 ha at Hiệp Phước commune, Nhà Bè District in serve for parking and maintenance of trains.

– The project consultants suggested to divide the investment into 4 phases:

+ Phase 1a: Station at Gia Định park – Hoàng Diệu station, including depot at Gia Định park (L=6,375 km).

+ Phase 1b: Station at Gia Định park – Thạnh Xuân (L = 6,975 km).

+ Phase 1c: Hoàng Diệu station – Phước Kiểng station (L = 4.95 km).

+ Phase 2: Phước Kiểng station – station at Hiệp Phước harbor (L= 17,35m)

8.  Form of investment:

ODA, PPP (BOT, BOT combined with BT)

9. Contact address:

Urban Railway Project Management Board

Address: 29 Lê Quý Đôn, Ward 7 District 3, Hồ Chí Minh City

Tel: (08)3930.9495 – (08)3930.9496

Fax: (08)3930.9497 – (08)3930.9498

10. NB:

Currently, domestic consultants are forming the project and basic design, which are expected to be completed and submitted to competent authority for investment project approval in 2016.

 

1.  Project type: Bridge – road
2.  Project title:

Constructing the Metro Line No. 4b (Gia Định Park Station – Lăng Cha Cả Station)

3.   Location:

Gò Vấp District, Tân Bình District.

4.  Total land area: 5.2 km2
5. Project objectives:

The Project is to construct a system of urban railways, under the general planning of the city, in connecting with other public traffic system in the city and other commercial services, providing public transport services with big capacity, safety and friendly to environment.

6. The expected investment capital: VND 23,100 billion (equivalent to US$ 1,050 million)
7. General information on the project

– Under Decision No. 568/QD-TTg dated 08/04/2013 by the Prime Minister approving the adjustment of planning for development of traffic and transport of Hồ Chí Minh City till 2020 and vision after 2020.

+ Route direction: Station at Gia Định park (the route No. 4) – Nguyễn Thái Sơn – Hồng Hà – Tân Sơn Nhất international airport – Trường Sơn – Hoàng Văn Thụ Park – station at Cha Cả Mausoleum (the route No. 5).

+ Metro No. 4b will go underground, is a branch route connecting Metro No. 4 (Gia Định Park Station) and Metro No. 5 (Cha Cả Mausoleum Station) and Tân Sơn Nhất airport.

+ The route has a mini depot located at Hoàng Văn Thụ park over an area of 2 ha.

8.  Form of investment:

ODA, PPP (BOT, BOT combined with BT)

9. Contact address:

Urban Railway Project Management Board

Address: 29 Lê Quý Đôn, Ward 7 District 3, Hồ Chí Minh City

Tel: (08)3930.9495 – (08)3930.9496

Fax: (08)3930.9497 – (08)3930.9498

10. NB:

– Currently, the section from Tân Sơn Nhất airport to Lang Cha Cà mausoleum area of Metro No. 5 (Route 4b-1) is being supported by the Korea International Cooperation Agency (KOICA) with technical assistance (TA) for project pre-feasibility study and feasibility study, expected to complete in 2017.

 

1.  Project type: Bridge – road
2.  Project title:

Constructing the Metro Line No. 5, Phase 2 (Bảy Hiền Intersection – Cần Giuộc Station) and Bình Chánh depot).

3.   Location:

Districts 5, 8, 10, 11 and Bình Chánh District, Tân Bình District, Phú Nhuận District, Bình Thạnh District.

4.  Total land area:

– Total length: 23.45 km

– Phase 2 (New Cần Giuộc depot – Bảy Hiền road-crossing) 14.56 km in length and Bình Chánh depot.

5. Project objectives:

The Project is to construct a system of urban railways, under the general planning of the city, in connecting with other public traffic system in the city and other commercial services, providing public transport services with big capacity, safety and friendly to environment.

6. The expected investment capital: VND 55,000 billion (equivalent to US$ 2,500 million)
7. General information on the project

– National key projects.

– Under Decision No. 568/QD-TTg dated 08/04/2013 of

Prime Minister approving the adjustment of planning for development of traffic and transport of HCMC till 2020 and vision after 2020:

+ Route direction: New Cần Giuộc depot – NH 50 – Cao Xuân Đức – Tùng Thiện Vương – Phù Đổng Thiên Vương – Lý Thường Kiệt – Bảy Hiền Intersection

+ The route has 8.56 km to go underground, 5.65 km to go high above and 0.35 km section of transition with 13 stations (8 underground stations and 5 high-above stations).

5.  Form of investment:

ODA, PPP (BOT, BOT combined with BT)

9. Contact address:

Urban Railway Project Management Board

Address: 29 Lê Quý Đôn, Ward 7 District 3, Hồ Chí Minh City

Tel: (08)3930.9495 – (08)3930.9496

Fax: (08)3930.9497 – (08)3930.9498

10. NB:

– Urban Railway Management Board is receiving and deploying the technical assistance (TA) provided by the Korean Export-Import Bank (KEXIM), including: prefeasibility study and feasibility study of the Metro line No. 5 – Phase 2 and the experience sharing program (KSP) for investment cooperation in the public-private form for the urban railway projects of the City.

– It is expected that the project feasibility will be completed to be submitted to the National Assembly for investment policy in 2017.

 

1.  Project type: Bridge – road
2.  Project title:

Project of investing in constructing Monorail No. 2 (NH 50 – Bình Quới Urban Area).

3.  Location:

District 2, District 7, Bình Chánh District, Bình Thạnh District.

4.  Total land area: 27.2 km2
5. Project objectives:

The Project is to construct a system of urban railways, under the general planning of the city, in connecting with other public traffic system in the city and other commercial services, providing public transport services with big capacity, safety and friendly to environment.

6. The expected investment capital: VND 15,015 billion (equivalent to US$ 683 million)
7. General information on the project

– National key projects.

– Project of constructing Monorail No. 2 has been registered in the national list of projects to call for foreign investment till 2020 in form of PPP investment under Decision 631/QD-TTg dated 19/4/2014 by the Prime Minister.

– Under Decision No. 568/QD-TTg dated 08/04/2013 by the Prime Minister approving the adjustment of planning for development of traffic and transport of Hồ Chí Minh City till 2020 and vision after 2020.

+ Route direction: NH 50 – Nguyễn Văn Linh – Trần Nạo – Xuân Thủy – Bình Quới Urban Area (Bình Thạnh District).

+ In the future, Monorail No. 2 is oriented to connect with Metro no. 3a (Bến Thành – Tân Kiên).

+ Depot area is 5.9 ha at Nguyễn Văn Linh road.

5.  Form of investment:

PPP (BOT or BOT combined with BT), ODA.

9. Contact address:

Urban Railway Project Management Board

Address: 29 Lê Quý Đôn, Ward 7 District 3, Hồ Chí Minh City

Tel: (08)3930.9495 – (08)3930.9496

Fax: (08)3930.9497 – (08)3930.9498

10. NB:

The Urban Railway Management Board is recommending the City to permit establishment of pre-feasibility report to ask for investment policy as prescribed by the Law on Public Investment.

 

1.  Project type: Bridge – road
2.  Project title:

The investment project for constructing Monorail No. 3 (Phan Văn Trị Crossroad, Nguyễn Oanh – Tân Chánh Hiệp station).

3.  Location:

Gò Vấp District, District 12

4.  Total land area: 16.5 km2
5. Project objectives:

The Project is to construct a system of urban railways, under the general planning of the city, in connecting with other public traffic system in the city and other commercial services, providing public transport services with big capacity, safety and friendly to environment.

6. The expected investment capital: VND 8,400 billion (equivalent to US$ 382 million)
7. General information on the project

– Project of Group A.

– Monorail No. 3 has been registered in the national list of projects to call for foreign investment till 2020 in form of PPP investment under Decision 631/QD-TTg dated 19/4/2014 by the Prime Minister.

– Under Decision No. 568/QD-TTg dated 08/04/2013 by the Prime Minister approving Planning for development of traffic and transport of Hồ Chí Minh City till 2020 and vision after 2020:

+ Route direction: Intersection (Phan Văn Trị – Nguyễn Oanh) – Phan Văn Trị – Quang Trung – Quang Trung Software Park – Tô Ký – Tân Chánh Hiệp station.

+ Depot at Tân Chánh Hiệp Ward with area of 5.9 ha.

5.  Form of investment:

The project is registered to be invested in the form of PPP according to the Prime Minister’s Decision No. 631/QD-TTg dated April 29, 2014

9. Contact address:

Urban Railway Project Management Board

Address: 29 Lê Quý Đôn, Ward 7 District 3, Hồ Chí Minh City

Tel: (08)3930.9495 – (08)3930.9496

Fax: (08)3930.9497 – (08)3930.9498

10. NB:

The Urban Railway Management Board is recommending the City to permit establishment of pre-feasibility report to ask for investment policy as prescribed by the Law on Public Investment.

 

1.  Project type: Bridge – road
2.  Project title:

Constructing Parking Lots at Gia Định Park (Zone D)

3.  Location:

Gò Vấp District

4.  Total land area:
5. Project objectives:

Completing traffic infrastructure under planning for socio-economic development

6. The expected investment capital: VND 174 billion (equivalent to US$ 8 million)
7. General information on the project

Project area: 8,000 m2 in Zone D. The investment will be divided into 02 phases:

+ Phase 1: Investing in a floating parking lot over the area of 8,000 m2 (for 161 2-wheel vehicles). Total investment: VND 5.71 billion

+ Phase 2: Investing in constructing a floating parking lot 03 floors over the area of 7,000 m2 (161 2-wheel vehicles + 37 cars). Total investment: VND 168 billion

5.  Form of investment: BOT
9. Contact address:

Department of Transportation and Communication

 

1.  Project type: Bridge – road
2.  Project title:

Constructing Parking Lots at Gia Định Park (03 planned locations)

3.  Location:

Gò Vấp District

4.  Total land area:
5. Project objectives:

Completing traffic infrastructure under planning for socio-economic development

6. The expected investment capital: VND 107 billion (equivalent to US$ 5 million)
7. General information on the project

Project area: 3,852 m2 (with 03 planned locations)

– Constructing 5 floors; capacity: 963 cars

8.  Form of investment: BOT
9. Contact address:

Department of Transportation and Communication

 

1.  Project type: Bridge – road
2.  Project title:

Constructing Dương Công Khi Road

3.  Location:

Hóc Môn District

4.  Total land area:
5. Project objectives:

Completing traffic infrastructure under planning for socio-economic development

6. The expected investment capital: VND 551 billion (equivalent to US$ 25 million)
7. General information on the project

Length: 6.905 km, Cross section: 30m

5.  Form of investment: BT
9. Contact address:

Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451

 

1.  Project type: Flood reduction
2.  Project title:

The project of improving the city’s water environment, phase 3

3.  Location:

Ward 7 Area, District 8: 200ha

Ward 7: 1,400ha

Doi-Te Canal basin of District 4, 7, 8

4.  Total land area: 1,600 ha
5. Project objectives:

The Project of Improving Water Environment in HCMC at basin Tàu Hũ – Bến Nghé – Đôi-Tẻ, phase 3 will have a project for synchronous connections of systems of drainage and waste water treatment already constructed in phase 1 and being constructed in phase 2 in order to develop a rain water drainage system, contributing to improving the environment, justifying the city, upgrading life quality of people, increasing the capacity of water drainage and water traffic on Canals Đôi and Tẻ, developing the rain water drainage system, overcoming water floods due to rains and tides at flooded areas in the region, complete the Canal-side traffic network and promote the best of projects for improvement of water environment under phase 1 and 2.

6. The expected investment capital: VND 18,804 billion (equivalent to US$ 855 million)
7. General information on the project:

On 28/07/2012, in the Notice No. 572/TB-VP of the Office of the Municipal People’s Committee, the Chairman of the Municipal People’s Committee agreed to assign the Urban Transportation Committee to chair the prefeasibility study of the city water environment improvement project, phase 3.

8.  Form of investment: ODA, PPP, etc.
9. Contact address:

Urban Traffic Work Construction Investment Management Unit

No. 3, Nguyễn Thị Diệu, Ward 6, District 3, Hồ Chí Minh City

Tel: (84-8) 39 300 530 – 39 306 638

Fax: (84-8) 39 300 530 – 39 306 638

 

1.  Project type: Flood reduction
2.  Project title:

The project of Dredging of Soài Rạp Canal (phase 2)

3.  Location:

HCMC, Long An and Tiền Giang

4.  Total land area:
5. Project objectives:

To reduce traffic jams and environmental pollution as well as facilitating the development corresponding to the city’s overall planning, the city’s harbors are being moved to Cát Lái and Hiệp Phước area. Several combined and container harbors have been built in Cát Lái area (projects of Tân Cảng Company) and Hiệp Phước, the center of HCMC. Apart from harbors that needs locating, a new combined harbor with an area of 300ha and a length of appx. 5km is being researched for investment in the South of Hiệp Phước industrial zone.

6. The expected investment capital: VND 8,480 billion (equivalent to US$ 385 million)
7. General information on the project:

On 04/6/2011, People’s Committee of Hồ Chí Minh City issued Decision No. 2763/QD-TTg on establishment of the investment project management board of the Soài Rạp Dredging Project (phase 2) with the task of raising money (budget, ODA, bank loans, capital contribution from other partners …) for implementation of the investment project of dredging Soài Rạp Canal (phase 2). Accordingly, the project needs to enable the harbors to bear the weight full load ships of 50,000DWT and offload ships of 70,000DWT.

To continue the deployment of the project, the project’s management board has sent Dispatch no. 52/CV BQLSRGĐ2 dated 26/02/2014 to the Department of Transport to request permission for preparing the second investment – stage 2 in Soài Rạp Dredging project.

8.     Form of investment: ODA, PPP, etc.
9. Contact address:

People’s Committee of Hồ Chí Minh City

Contact address: No. 86 Lê Thánh Tôn street – Bến Nghé ward – District 1 – Hồ Chí Minh City.

Tel: (84-8) 329 1054  Fax: (84-8) 329 6988.

Investor: Investment management Unit of Soài Rạp Canal dredging project (phase 2)

Contact address: 9-19 Hồ Tùng Mậu, Nguyễn Thái Bình ward, District 1, Hồ Chí Minh City;

Tel: (84-8) 62990519  Fax: (84-8) 62990549.

 

1.  Project type: Flood reduction
2.  Project title:

Project of dredging Soài Rạp Flow (phase 3)

3.  Location:

HCMC, Long An and Tiền Giang

4.  Total land area : 744 ha (land area is not available)
5. Project objectives:

Investing in dredging, upgrading and expanding ship flow and system of buoys and signals meeting clearance requirements for ship with tonnage of 50,000 DWT (full load) and over 50,000 DWT (less load) exiting and/or entering ports along Soài Rạp river; meeting requirements for socio-economic development in HCMC and adjacent provinces as well as needs to develop the sea port system on Soài Rạp river

6. The expected investment capital: VND 7,900 billion (equivalent to US$ 359 million)
7. General information on the project:

Based on Dispatch no.5917/UBND-QLDA dated 13/11/2014 by the City People’s Committee assigning the Department of Transport to work with related Ministries and divisions to mobilize feasible investment capital sources to implement the project of dredging for Soài Rạp Canal – phase 3

Based on Dispatch No. 9630/SGTVT-GTT dated 8/12/2014 by the Department of Transport assigning the Management Unit for Project of dredging for Soài Rạp Canal (phase 2) to follow the content of the said dispatch

Based on Dispatch no. 3920/SGTVT-GTT dated 19/5/2015 of the Department of Transport suggesting to integrate the project of dredging for Soài Rạp Canal (phase 3) into the list of funds using ODA capital and preferred capital

8. Form of investment: ODA, PPP, etc.
9. Contact address:

People’s Committee of Hồ Chí Minh City

Contact address: No. 86 Lê Thánh Tôn street – Bến Nghé ward – District 1 – Hồ Chí Minh City.

Tel: (84-8) 329 1054  Fax: (84-8) 329 6988.

Investor: Investment management Unit of Soài Rạp Canal dredging project (phase 2)

Contact address: 9-19 Hồ Tùng Mậu, Nguyễn Thái Bình ward, District 1, Hồ Chí Minh City;

Tel: (84-8) 62990519  Fax: (84-8) 62990549.

 

1.  Project type: Flood reduction
2.  Project title:

The project of prevention of erosion on Thanh Đa peninsula

3.  Location:

Bình Thạnh District

4.  Total land area:
5. Project objectives:

Preventing erosion, creating urban landscape.

6. The expected investment capital: VND 1,000 billion (equivalent to US$ 45 million)
7. General information on the project:

Technical data: investment in embankment of Sai Gon river at Thanh Đa peninsula – section 3 (Bình Quới, Cây Bàng, Chùa Ditch) with length: ~ 5,000m.

Decision No. 5754/QĐ-UBND dated 12/11/2012 of the People’s Committee of the city on approving the portfolio of investment projects under BOT and BT form in the city

8. Form of investment: ODA, PPP,…
9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451

 

1.  Project type: Agriculture
2.  Project title:

Investment on the city’s center for aquaculture in Can Gio province

3.  Location:

Cần Giờ District

4.  Total land area:
5. Project objectives:

Establishing centers for trade and logistics for fisheries with advanced technology from other countries in the region, ensuring the aims to implement Vietnam’s marine strategies

6. The expected investment capital: VND 1,200 billion (equivalent to US$ 55 million)
7. General information on the project:

Decision No. 5754/QĐ-UBND dated 12/11/2012 of the People’s Committee of the city on approving the portfolio of investment projects under BOT and BT form in the city

‘- Building harbors and fish market on the scale of 20ha along Soài Rạp river

– Constructing a zone for aqua-product processing factories, warehouses, and logistic service facilities for fishing industry with a size of 80ha

Construction period: 3 years

8. Form of investment: PPP, etc.
9. Contact address:

Hồ Chí Minh City Department of Transportation and Communication

Address: 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City

Tel: 84-8- 3829 0451

 

1.  Project type: Agriculture
2.  Project title:

Investment in construction of the hi-tech agriculture zone for fishery in Cần Giờ District

3.  Location:

Hào Võ Area, Long Hòa Commune, Cần Giờ District, Hồ Chí Minh City

4.  Total land area: 50 ha
5. Project objectives:

Building technical infrastructure for scientific research, experimental demonstration of variety production models, saline aquaculture, brackish water aquaculture. Calling for investment in production of aquatic varieties

6. The expected investment capital: VND 400 billion (equivalent to US$ 18 million)
7. General information on the project:

Notice No. 701/TB-VP dated 15/11/2010 at the meeting on the project to expand and develop the Hi-tech Agriculture Zone in the field of brackish and salt water fisheries in Hào Võ, Long Hòa Commune, Cần Giờ District;

Pursuant to Notice No.156/TB-VP dated 17/3/2011 on the merging of the Coastal Economic Development Company with Sài Gòn Trading Corporation Limited;

Pursuant to Notice No. 514/TB-VP dated 28/06/2012 on the activities of the City’s Hi-tech agricultural zone and the implementation of investment projects to build the high-tech agriculture zone of fisheries in Cần Giờ;

Pursuant to Decision 612/QD-UBND dated 01/02/2013 of Hồ Chí Minh City People’s Committee approving the task of planning and zoning at the scale of 1/ 2,000 the hi-tech aqua-cultural zone in the region of Hào Võ, Long Hòa Commune, Cần Giờ District.

8. Form of investment: FDI and other forms proposed by the Investor…
9. Contact address:

High Tech Agriculture Zone Management Board

Mr. Đinh Minh Hiệp

Position: Director of the High Tech Agriculture Zone Management Board

Tel: (08) 38238386

Mobile: 0918.144.422

Email: dinhminhhiep@gmail.com

 

1.  Project type: Agriculture
2.  Project title:

The Project of constructing High-tech Agriculture Zone (23ha) in Phước Vĩnh An Commune, Củ Chi District, HCMC

3.  Location:

Phước Vĩnh An Commune, Củ Chi District, HCMC

4.  Total land area: 18.3 ha
5. Project objectives:

Constructing a High Tech Application Growing and After-harvesting Zone Priority is given to calling for investment in production of edible mushrooms and medicinal mushrooms

6. The expected investment capital: VND 121 billion (equivalent to US$ 5 million)
7. General information on the project:
8. Form of investment: FDI and other forms proposed by the Investor…
9. Contact address:

High Tech Agriculture Zone Management Board

Mr. Đinh Minh Hiệp

Position: Director of the High Tech Agriculture Zone Management Board

Tel: (08) 38238386

Mobile: 0918.144.422

Email: dinhminhhiep@gmail.com

 

 

1.  Project type: Gentrification and building houses, resettlement
2.  Project title:

Implementing gentrification, building high-rise condominiums in the remaining area of Ward 11

3.  Location:

Ward 11, District 8

4.  Total land area: 128,000 m2
5. Project objectives:

Gentrification, building high-rise condominiums

1.  The expected investment capital: VND 15,052 billion (equivalent to US$ 684 million)
2.  General information on the project:

Pursuant to Decision No 3792/QDUBND dated 12/7/2013 of the City People’s Committee on approving the detailed plan of subdivision at the scale of 1/ 2,000 (Zoning plan) Residential area of Ward 11 District 8 (Land Use – Architecture – Traffic Planning)

8. Form of investment: FDI and other forms proposed by the Investor…
9. Contact address:

District 8’s People’s Committee

No. 4 Road 1011 Phạm Thế Hiển, Ward 5, District 8

Tel: (08)54311355 – (08)54314313

 

1.  Project type: Gentrification and building houses, resettlement
2.  Project title:

Implementing gentrification, building residential houses, high-rise condominiums in the Xăng Thổi zone, Ward 1

3.  Location:

Ward 1, District 8

4.     Total land area: 47,330 m2
5. Project objectives:

Gentrifying the city, constructing residential houses, high-rise condominiums

5.  The expected investment capital: VND 7,038.4 billion (equivalent to US$ 320 million)
6.  General information on the project:

Pursuant to Decision No 4141/QD-UBND dated 31/7/2013 of the City People’s Committee on approving the detailed plan of subdivision at the scale of 1/ 2,000 (Zoning plan) Residential area of Ward 1 District 8 (Land Use – Architecture – Traffic Planning)

8. Form of investment: FDI and other forms proposed by the Investor…
9. Contact address:

District 8’s People’s Committee

No. 4 Phạm Thế Hiển, Ward 5, District 8

Tel: (08)54311355 – (08)54314313

 

1.  Project type: Gentrification and building houses, resettlement
2.  Project title:

Implementing gentrification, building residential houses, high-rise condominiums in the investment area near Y-shaped bridge of Ward 8

3.  Location:

Ward 8, District 8

4.  Total land area: 44,210 m2
5. Project objectives:

Gentrifying the city, constructing residential houses, high-rise condominiums

5.  The expected investment capital: VND 6,021 billion (equivalent to US$ 274 million)
6.  General information on the project:

The Scheme of adjusting the detailed planning of constructing residential area of wards 8-9-10 of District 8 at the scale of 1/2,000 has been approved by the People’s Committee of District 8 under decision No. 8372/QD-UBND dated 10/12/2009

8. Form of investment: FDI and other forms proposed by the Investor…
9. Contact address:

District 8’s People’s Committee

No. 4 Road 1011 Phạm Thế Hiển, Ward 5, District 8

Tel: (08)54311355 – (08)54314313

 

7.  Project type: Gentrification and building houses, resettlement
8.  Project title:

Implementing gentrification, building high-rise condominiums South of East-West Avenue – Ruột Ngựa canal

9.  Location:

Ward 16, District 8

10.                        Total land area: 44,359 m2
5. Project objectives:

Gentrifying the city, constructing residential houses, high-rise condominiums

11.            The expected investment capital: VND 5,024 billion (equivalent to US$ 228 million)
12.            General information on the project:

Pursuant to Decision No 4055/QDUBND dated 26/7/2013 of the City People’s Committee on approving the detailed plan of subdivision at the scale of 1/ 2,000 (Zoning plan) Residential area of Ward 16 District 8

8. Form of investment: FDI and other forms proposed by the Investor…
9. Contact address:

District 8’s People’s Committee

No. 4 Road 1011 Phạm Thế Hiển, Ward 5, District 8

Tel: (08)54311355 – (08)54314313

 

1.  Project type: Gentrification and building houses, resettlement
2.  Project title:

Implementing gentrification of Ward 15

3.  Location:

Ward 15, District 8

4.  Total land area: 1,506,718 m2
5. Project objectives:

Gentrification

5.  The expected investment capital: VND 5,024 billion (equivalent to US$ 228 million)
6.  General information on the project:

Pursuant to the Scheme of adjusting the 1/2000 detailed planning of constructing urban area: scale 1/2,000 with respect to Rạch Lão residential area (Zone A), Ward 15, District 8, approved by District 8’s People’s Committee under decision No. 10322/QD-UBND dated 17/9/2010.

8. Form of investment: FDI and other forms proposed by the Investor…
9. Contact address:

District 8’s People’s Committee

No. 4 Road 1011 Phạm Thế Hiển, Ward 5, District 8

Tel: (08)54311355 – (08)54314313

 

1.  Project type: Gentrification and building houses, resettlement
2.  Project title:

Gentrifying the city, constructing high-rise condominiums at the end of Tạ Quang Bửu road

3.  Location:

Ward 6, District 8

4.  Total land area: 8,230 m2
5. Project objectives:

Gentrification, building high-rise condominiums

6. The expected investment capital: VND 1,018 billion (equivalent to US$ 46 million)
7.  General information on the project:

Pursuant to Decision No 5123/QDUBND dated 20/9/2013 of the City People’s Committee on approving the detailed plan of subdivision at the scale of 1/ 2,000 (Zoning plan) of the residential area of Ward 6 District 8 (Land Use – Architecture – Traffic Planning)

8. Form of investment: FDI and other forms proposed by the Investor…
9. Contact address:

District 8’s People’s Committee

No. 4 Road 1011 Phạm Thế Hiển, Ward 5, District 8

Tel: (08)54311355 – (08)54314313

 

1.  Project type: Gentrification and building houses, resettlement
2.  Project title:

Investing in office buildings for lease for self-use purposes at the land lot for lease of Quang Trung Software Park

3.  Location:

Quang Trung Software Park, Tân Chánh Hiệp Ward District 12 HCMC

4.  Total land area: 5,000 m2 on average
5. Project objectives:

Investing in office buildings for lease for self-use purposes (related to information technologies such as software production building, IT services, data centers…..)

6. The expected investment capital: VND 220 billion (equivalent to US$ 10 million)
7. General information on the project:

Total area: 43ha

Land lot no.: 51

Land use purposes: 91.8% for development of software, IT services… 8.2% for other facility services such as schools, expert houses

Planning density:  2,367 experts

33,682 engineers and students

3,391 labors in support services

Construction density: 40%

Planned floors: 12 floors

Floor area ratio: 5

Land delivery conditions: Clean land, already filled up and leveled, planned at ratio 1/500, completed infrastructure

Technical infrastructure

Electrical system:

Power station will be constructed and completed at the land lot and connected from the main grid line of QTSC.

Power source: 2,500 KVA/land lot.

Systems of water supply and drainage:

Water supply system: includes a system of water lines to every land lot.

Waste water treatment system: Every land lot will have a waste water treatment system connected to a general waste water treatment plant.

Rain water drainage system: Available on every land lot.

System of fire nozzles: Available on very interchange of the land lot and at the density of 150m/1 nozzle.

Telecommunication infrastructure: Already available with a system of underground trenches, underground optic fibers on every land lot.

8.  Form of investment: FDI-foreign investment
9.  Contact address: QUANG TRUNG SOFTWARE PARK DEVELOPMENT

COMPANY LIMITED

Building 3, Quang Trung Software, Tân Chánh Hiệp Ward, District 12,

T: (84.8)3 7155 055      F: (84.8) 37155 985

E: qtsc@qtsc.com.vn

W: www.qtsc.com.vn

 

1.  Project type: Gentrification and building houses, resettlement
2.  Project title:

Implementing gentrification of the area at the end of Tạ Quang Bửu Street, Ward 6

3.  Location:

Ward 6, District 8

4.  Total land area: 8,230m2
5. Project objectives:

Gentrification, building high-rise condominiums

5.  The expected investment capital: VND 1,018 billion (equivalent to US$ 46 million)
6.  General information on the project:

Pursuant to Decision No 5123/QDUBND dated 20/9/2013 of the City People’s Committee on approving the detailed plan of subdivision at the scale of 1/ 2,000 (Zoning plan) of the residential area of Ward 6 District 8 (Land Use – Architecture – Traffic Planning)

Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…

There are currently 117 houses to be removed, at locations bordering Tạ Quang Bửu road. Not yet finished in land compensation and clearance

7.  Form of investment:

Form of investment: ODA, PPP, OBT, FDI and other forms proposed by the Investor

Socialization

8.  Contact address:

District 8’s People’s Committee

No. 4 Road 1011 Phạm Thế Hiển, Ward 5, District 8

Tel: (08)54311355 – (08)54314313

 

1.  Project type: Gentrification and building houses, resettlement
2.  Project title:

Constructing Topical parks at the North-Western Urban Area

3.  Location:

North-Western Urban Area

4.  Total land area: 167.34ha
5.     Project objectives:

In serve for amusement and entertainment needs of people inside and outside the North-Western Urban Area

6.     The expected investment capital: TBD
7.     General information on the project:

Current land status: not yet finished in land compensation and clearance

8.  Form of investment:

Socialization

9.  Contact address:

North-Western Urban Area Management Board

 

1.  Project type: Gentrification and building houses, resettlement
2.  Project title:

Constructing the Condominiums at Lot IV-VI, Thanh Đa Apartments

3.  Location:

W.27, Bình Thạnh District

4.  Total land area: 7.73 ha
5.     Project objectives:

Commercial housing and resettlement housing

6.     The expected investment capital: VND 2,069 billion (equivalent to US$ 94 million)
7.     General information on the project:

Notice No. 964/TB-VP dated 10/12/2013 of the Office of the City’s People’s Committee

8.  Form of investment:

FDI and other forms proposed by the Investor…

9.  Contact address:

Department of Construction

Address: No. 60 Trương Định Street, Ward 7, District 3, Hồ Chí Minh City

Tel: (08) 3932 5345 – Fax : (08) 3932 5269 – Email : sxd@tphcm.gov.vn

Website: http://www.constructiondpt.hochiminhcity.gov.vn/

 

1.  Project type: Gentrification and building houses, resettlement
2.  Project title:

The Project of constructing commercial residential houses 32ha

3.  Location:

Nhà Bè District

4.  Total land area: 33.62 ha
5.     Project objectives:

Commercial houses

6.     The expected investment capital: VND 1,260 billion (equivalent to US$ 57 million)
7.     General information on the project:

Constructed area: 17.96ha, about 1,000 units

8.  Form of investment:

FDI,…

9.  Contact address:

Department of Construction

Address: No. 60 Trương Định Street, Ward 7, District 3, Hồ Chí Minh City

Tel: (08) 3932 5345 – Fax : (08) 3932 5269 – Email : sxd@tphcm.gov.vn

Website: http://www.constructiondpt.hochiminhcity.gov.vn/

 

1.  Project type: Gentrification and building houses, resettlement
2.  Project title:

Constructing the resettlement area and commercializing  high-rise condominiums in the residential area South of the Ring Road No. 02

3.  Location:

Ward 7, District 8

4.  Total land area: 10,000 ha
5.     Project objectives:

Resettlement and commercialization of high-rise condominiums.

6.     The expected investment capital: VND 1,505 billion (equivalent to US$ 68 million)
7.     General information on the project:

Pursuant to Decision No 3907/QDUBND dated 18/7/2013 of the City People’s Committee on approving the detailed plan of subdivision at the scale of 1/2,000 (Zoning plan) Phú Lợi Residential Area of Ward 7 District 8

8.  Form of investment:

FDI and other forms proposed by the Investor…

9.  Contact address:

District 8’s People’s Committee

No. 4 Road 1011 Phạm Thế Hiển, Ward 5, District 8

Tel: (08)54311355 – (08)54314310

 

1.  Project type: Gentrification and building houses, resettlement
2.  Project title:

The Project of constructing commercial residential houses 35ha

3.  Location:

Nhà Bè District

4.  Total land area: 33.15 ha
5.     Project objectives:

Commercial houses

6.     The expected investment capital: VND 1,724 billion (equivalent to US$ 78 million)
7.     General information on the project:

Constructed area: 16.68 ha, about 1,000 units

8.  Form of investment:

FDI,…

9.  Contact address:

Department of Construction

Address: No. 60 Trương Định Street, Ward 7, District 3, Hồ Chí Minh City

Tel: (08) 3932 5345 – Fax : (08) 3932 5269 – Email : sxd@tphcm.gov.vn

Website: http://www.constructiondpt.hochiminhcity.gov.vn/

 

1.  Project type: Gentrification and building houses, resettlement
2.  Project title:

The Project of building Bình Chánh Electric Power residential houses

3.  Location:

H. Bình Chánh

4.  Total land area: 18.79 ha
5.     Project objectives:

Social and commercial housing

6.     The expected investment capital: VND 1,217 billion (equivalent to US$ 55 million)
7.     General information on the project:

Constructing residential houses in 10.5 ha. Number of units:1254 units

8.  Form of investment:

FDI and other forms proposed by the Investor…

9.  Contact address:

Department of Construction

Address: No. 60 Trương Định Street, Ward 7, District 3, Hồ Chí Minh City

Tel: (08) 3932 5345 – Fax : (08) 3932 5269 – Email : sxd@tphcm.gov.vn

Website: http://www.constructiondpt.hochiminhcity.gov.vn/

 

1.  Project type: Gentrification and building houses, resettlement
2.  Project title:

The investment project to build Tân Tạo Residential Center – Zone B, Tân Tạo A Ward, Bình Tân District

3.  Location:

Tân Tạo A Ward, Bình Tân District

4.  Total land area: 145.68 ha
5.     Project objectives:

Investment in complete construction of the project of Tân Tạo B residential center, ensuring connectivity of synchronous technical and social infrastructure of the project in the technical and social infrastructure of Bình Tân District and Bình Chánh District.

6.     The expected investment capital: TBD
7.     General information on the project:

Pursuant to Decision No 2644/QD-UBND dated 24/03/2009 of Bình Tân District’s People’s Committee approving the detailed planning task for urban construction at the scale of 1/500 Tân Tạo residential area (Zone B) Tân Tạo A Ward, Bình Tân District

8.  Form of investment:

FDI and other forms proposed by the Investor…

9.  Contact address:

Department of Construction

Address: No. 60 Trương Định Street, Ward 7, District 3, Hồ Chí Minh City

Tel: (08) 3932 5345 – Fax : (08) 3932 5269 – Email : sxd@tphcm.gov.vn

Website: http://www.constructiondpt.hochiminhcity.gov.vn/

 

1.  Project type: Gentrification and building houses, resettlement
2.  Project title:

Constructing the Resettlement area for the North-Western Urban Area

3.  Location:

North-Western Urban Area

4.  Total land area: 35 ha
5.     Project objectives:

In serve for resettlement of the North-Western Urban Area

6.     The expected investment capital: VND 714  billion (equivalent to US$ 32 million)
7.     General information on the project:

Current land status: not yet finished in land compensation and clearance

8.  Form of investment:

FDI and other forms proposed by the Investor…

9.  Contact address:

North-Western Urban Area Management Board

 

1.  Project type: Education
2.  Project title:

The Project of transforming preschool, primary and secondary schools of Ward 4 to gentrify the urban area, construct high-rise apartment buildings

3.  Location:

Ward 4 District 8

4.  Total land area: 21,888m2
5.     Project objectives:

Gentrification, building high-rise condominiums

6.     The expected investment capital: VND 3,010 billion (equivalent to US$ 137 million)
7.     General information on the project:

The Scheme of adjusting the detailed planning of constructing condominiums – cultural park in Ward 4 District 8 at the scale of 1/2,000 has been approved by the People’s Committee of District 8 under decision No. 7930/QD-UBND dated 05/7/2010.

8.  Form of investment:

FDI and other forms proposed by the Investor…

9.  Contact address:

District 8’s People’s Committee

No. 4 Road 1011 Phạm Thế Hiển, Ward 5, District 8

Tel: (08)54311355 – (08)54314310

 

1.  Project type: Education
2.  Project title:

The investment project to build a primary school in Phú Mỹ Ward, District 7

3.  Location:

Phú Mỹ Ward, District 7

4.  Total land area: 14,330m2
5.     Project objectives:

Constructing a primary school of national standards

6.     The expected investment capital: TBD
7.     General information on the project:

Official Letter No.742/UBND-DTMT dated 26/02/2016 of the City’s People’s Committee calling for investment projects to build a primary school of national standards in Phú Mỹ Ward, District 7 on the land area managed by the District 7’s People’s Committee

8.  Form of investment:

Socialization

9.  Contact address:

People’s Committee of District 7

 

1.  Project type: Education
2.  Project title:

Constructing a kindergarten at the house area of Ứng Thành Company

3.  Location:

The land lot is under planning for a kindergarten at project of the house area at Ward 7 by investor named Ứng Thanh Trading & Construction Co., Ltd.

4.  Total land area: 687 m2
5.     Project objectives:

Constructing schools

6.     The expected investment capital: TBD
7.     General information on the project:

– Construction density: 40% max

– Height: not more than 03 floors.

– Including items: classrooms and functional rooms, playgrounds, internal roads, yards and gardens.

8.  Form of investment:

Socialization

9.  Contact address:

District 8’s People’s Committee

No. 4 Road 1011 Phạm Thế Hiển, Ward 5, District 8

Tel: (08)54311355 – (08)54314310

 

1.  Project type: Education
2.  Project title:

Constructing a kindergarten at the house area of Minh Sơn Company

3.  Location:

The land lot is under planning for a kindergarten at project of the house area at Ward 7 by investor named Minh Sơn Co., Ltd.

4.  Total land area: 800 m2
5.     Project objectives:

Constructing schools

6.     The expected investment capital: TBD
7.     General information on the project:

– Construction density: 40% max

– Height: not more than 03 floors.

– Including items: classrooms and functional rooms, playgrounds, internal roads, yards and gardens.

8.  Form of investment:

Socialization

9.  Contact address:

District 8’s People’s Committee

No. 4 Road 1011 Phạm Thế Hiển, Ward 5, District 8

Tel: (08)54311355 – (08)54314310

 

1.  Project type: Education
2.  Project title:

Constructing a kindergarten at Ward 1 (Nhà Cháy area)

3.  Location:

The land lot at Nhà Cháy area Ward 1 (2004)

4.  Total land area: 1,079 m2
5.     Project objectives:

Constructing schools

6.     The expected investment capital: TBD
7.     General information on the project:

– Construction density: 40% max

– Height: not more than 03 floors.

– Including items: classrooms and functional rooms, playgrounds, internal roads, yards and gardens.

8.  Form of investment:

Socialization

9.  Contact address:

District 8’s People’s Committee

No. 4 Road 1011 Phạm Thế Hiển, Ward 5, District 8

Tel: (08)54311355 – (08)54314310

 

1.  Project type: Education
2.  Project title:

Project of Movement Area for universities – colleges

3.  Location:

North-Western Urban Area

4.  Total land area: 131.13 ha
5.     Project objectives:

Removal of universities and colleges currently in the city

6.     The expected investment capital: TBD
7.     General information on the project:

Current land status: not yet finished in land compensation and clearance

8.  Form of investment:

Socialization

9.  Contact address:

North-Western Urban Area Management Board

 

1.  Project type: Health
2.  Project title:

Constructing a Hospital complex

3.  Location:

North-Western Urban Area

4.  Total land area: 131 ha
5.     Project objectives:

Constructing a Hospital complex including inner-city hospitals to be removed and some new hospitals for the Southeastern Area and other countries such as Cambodia, Thailand, Laos…

6.     The expected investment capital: TBD
7.     General information on the project:

Current land status: not yet finished in land compensation and clearance

8.  Form of investment:

Socialization

9.  Contact address:

North-Western Urban Area Management Board

 

1.  Project type: Culture – Sports
2.  Project title:

Planning the construction of the Rạch Chiếc National Sports Complex

3.  Location:

District 2

4.  Total land area: 185.7315 ha
5.     Project objectives:

Hồ Chí Minh City People’s Committee has advocated planning a dedicated complex of sports and auxiliary works of national level, international standard to hold large-scale national and international sports games.

6.     The expected investment capital: VND 21,200 billion (equivalent to US$ 964 million)
7.     General information on the project:

_ Resolutions of the City’s Party Unit’s Congress VII, VIII and IX.                           _Decision No. 2631/QD-TTg dated 31/12/2013 of the Prime Minister approving the comprehensive planning of socio-economic development of Hồ Chí Minh City to 2020, Vision to 2025.

8.  Form of investment:

FDI and other forms proposed by the Investor…

9.  Contact address:

Rạch Chiếc Gymnastic Center

3 Phan Văn Đạt, Bến Nghé, District 1, Hồ Chí Minh City

 

1.  Project type: Culture – Sports
2.  Project title:

Constructing the Music Symphony and Ballet Theatre

3.  Location:

Park 23/9, District 1

4.  Total land area: 1.2 ha
5.     Project objectives:

This is a key project of the City, according to the Resolution of Hồ Chí Minh City’s Party Committee’s IX Congress, large in scale and symbolic of the City, contributing to the widespread development of music and ballet to strata of people and communities.

6.     The expected investment capital: VND 2,200 billion (equivalent to US$ 100 million)
7.     General information on the project:

_ Resolutions of the City’s Party Unit’s Congress VII, VIII and IX.                           _Decision No. 2631/QD-TTg dated 31/12/2013 of the Prime Minister approving the comprehensive planning of socio-economic development of Hồ Chí Minh City to 2020, Vision to 2025.

8.  Form of investment:

PPP

9.  Contact address:

Construction Investment Projects Management Board – Department of Culture, Sports and Tourism

164 Đồng Khởi,  Bến Nghé Ward,  District 1, Hồ Chí Minh City

Tel: (84-8) 38225503, 38237908 | Fax: (84-8) 38292093

 

1.  Project type: Culture – Sports
2.  Project title:

Constructing Phú Thọ Multifunctional Acrobatic and Performing Theatre

3.  Location:

District 11

4.  Total land area: 1 ha
5.     Project objectives:

This work is to serve the development needs of the city’s cultural sector in circus performances and other performing arts disciplines.

6.     The expected investment capital: VND 1,530 billion (equivalent to US$ 70 million)
7.     General information on the project:

_Decision No. 2631/QD-TTg dated 31/12/2013 of the Prime Minister approving the comprehensive planning of socio-economic development of Hồ Chí Minh City to 2020, Vision to 2025.

8.  Form of investment:

PPP

9.  Contact address:

Construction Investment Projects Management Board – Department of Culture, Sports and Tourism

164 Đồng Khởi,  Bến Nghé Ward,  District 1, Hồ Chí Minh City

Tel: (84-8) 38225503, 38237908 | Fax: (84-8) 38292093

 

1.  Project type: Culture – Sports
2.  Project title:

Project of upgrading and expanding the City General Museum

3.  Location:

National Culture and History Park, District 9, HCMC

4.  Total land area: 15.45 ha
5.     Project objectives:

To preserve and promote the values of Vietnamese cultural relics, attract a great deal of visitors, tourists; to be a general complex with artistic architecture, a place for sightseeing, organization of traditional festivals, symposia, scientific workshops; to be a place attracting socialized activities, investments in culture, sports, tourist promotion, contributing to socio-economic development of the city. HCMC.

6.     The expected investment capital: VND 1,447 billion (equivalent to US$ 66 million)
7.     General information on the project:
8.  Form of investment:

PPP

9.  Contact address:

Construction Investment Projects Management Board – Department of Culture, Sports and Tourism

164 Đồng Khởi,  Bến Nghé Ward,  District 1, Hồ Chí Minh City

Tel: (84-8) 38225503, 38237908 | Fax: (84-8) 38292093

 

1.  Project type: Social infrastructure
2.  Project title:

The project of building Bình Khánh Cemetery

3.  Location:

4.  Bình Lợi Hamlet, Bình Khánh Commune, Cần Giờ District, HCMC

5.  Total land area: 30 ha
6.     Project objectives:

Constructing park cemetery

7.     The expected investment capital: TBD
8.     General information on the project:

– Pursuant to Decision No.4766/QD-UBND dated September 15, 2012 of the City People’s Committee on approval of the adjustment of the general construction planning of Cần Giờ District

– Pursuant to Decision No.2357/QD-UBND dated May 16, 2014 of the City People’s Committee on approval of the land use planning to 2020 of Cần Giờ District.

– Pursuant to Decision No.237/QD-UBND dated March 25, 2015 of the People’s Committee of Cần Giờ District on approval of the new rural planning for the period of 2011-2025 of Bình Khánh Commune, Cần Giờ District.

* Site clearance and compensation: Not yet implemented

9.  Form of investment: Socialization
10.               Contact address:

Mr. Trần Văn Sáu

(Tel: 08. 3.8740.215 – 0918.11.6876)

Position: Deputy Head of the Financial-Planning Department of Cần Giờ District, cum permanent deputy head of Investment promotion team of Cần Giờ District.

 

BASIC INFORMATION ON THE PROJECT FORM
1.     Project type: Transport infrastructure.
2.     Project name: Road along Canal 5.
3.     Location: Urban Area in the North-West of Hồ Chí Minh City.
4.     Land area to be used: 19.66 ha
5.     Total investment: VND 769 billion
6.     Form of investment: PPP- BT contract
7.     Project objectives: Investing in infrastructure under the approved planning, facilitating the development of the North-Western Urban Area
8.     General information on the project: Already approved by the City People’s Committee in the list of investment projects in form of BT at Decision No. 5754/QD-UBND dated 12/11/2012. Current land status: not yet finished in land compensation and clearance.
9.     Photo:
10.                        Contact agency: North-Western Urban Area Management Board

 

BASIC INFORMATION ON THE PROJECT FORM
1.     Project type: Transport infrastructure.
2.     Project name: Road along Canal 7
3.     Location: Urban Area in the North-West of Hồ Chí Minh City.
4.     Land area to be used: 20.8 ha
5.     Total investment: VND 965 billion
6.     Form of investment: PPP- BT contract
7.     Project objectives: Investing in infrastructure under the approved planning, facilitating the development of the North-Western Urban Area
8.     General information on the project: Already approved by the City People’s Committee in the list of investment projects in form of BT at Decision No. 5754/QD-UBND dated 12/11/2012. Current land status: not yet finished in land compensation and clearance.
9.     Photo:
10.                        Contact agency: North-Western Urban Area Management Board

 

BASIC INFORMATION ON THE PROJECT FORM
1.     Project type: Transport infrastructure
2.     Project name: Internal road connecting Canal 5 – Canal 7
3.     Location: Urban Area in the North-West of Hồ Chí Minh City
4.     Land area to be used: 4.33 ha
5.     Total investment: VND 239 billion
6.     Form of investment: PPP- BT contract
7.     Project objectives: Investing in infrastructure under the approved planning, facilitating the development of the North-Western Urban Area
8.     General information on the project: Already approved by the City People’s Committee in the list of investment projects in form of BT at Decision No. 5754/QD-UBND dated 12/11/2012. Current land status: not yet finished in land compensation and clearance.
9.     Photo:
10.                        Contact agency: North-Western Urban Area Management Board

 

PROJECT INFORMATION FORM

(Project information form)

·        Project type: Transport infrastructure

(Project type: for example: Infrastructure – Urban Railway, Infrastructure – Ports, Housing, Health care…).

·        Project name: Road connecting Bình Thái Intersection to Phạm Văn Đồng road

(Project name)

·        Location: Thủ Đức District

(Location)

·        Area square:

(Total land, water surface to be used)

·        Projected Investment: VND 1,324 billion (including site clearance VND 1,012 billion)

(The expected investment capital, denominated in VND and USD)

·        Investment type: BT

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

·        Objectives: Complete the traffic infrastructure as planned for socio-economic development.

(Project objective)

·        General information: Road length: 1,989km; Cross section in phase 1: 67m (2m slope + 2m road-side + 9.5m pavement + 1.5m road-side + 37m empty space + 1.5m road-side + 9.5m pavement + 2m road-side + 2m slope).

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

·        Pictures: master plan, map, design, illustration … (PC file formats, quality and size enough for printing)

(Image: master plan, map, design, illustration … (PC format, quality and size enough for printing) 

·        Contact agency: City People’s Committee, Department of Planning and Investment, Department of Transportation and Communication

(Contact agency)

 

PROJECT INFORMATION FORM

(Project information form)

·        Project type: Transport infrastructure

(Project type: for example: Infrastructure – Urban Railway, Infrastructure – Ports, Housing, Health care…).

·        Project Name: Road connecting An Lạc Intersection to Nguyễn Văn Linh road

(Project name)

·        Location: Bình Tân District, District 8, Bình Chánh District

(Location)

·        Area square:

(Total land, water surface to be used)

·        Projected Investment: VND 6,059 billion (including site clearance VND 4,200 billion)

(The expected investment capital, denominated in VND and USD)

·        Investment type: BT

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

·        Objectives: Complete the traffic infrastructure as planned for socio-economic development.

(Project objective)

·        General information: 02 lanes at each side with: the road length of about 5.3km, Cross section: 60m (by the completion phase will have 10 lanes (04 lanes in the middle, 06 lanes on two sides))

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

·        Pictures: master plan, map, design, illustration … (PC file formats, quality and size enough for printing)

(Image: master plan, map, design, illustration … (PC format, quality and size enough for printing) 

·        Contact agency: City People’s Committee, Department of Planning and Investment, Department of Transportation and Communication

(Contact agency)

 

PROJECT INFORMATION FORM

(Project information form)

·        Project type: Transport infrastructure

(Project type: for example: Infrastructure – Urban Railway, Infrastructure – Ports, Housing, Health care…).

·        Project Name: Nguyễn Hữu Cảnh road

(Project name)

Location: Bình Thạnh District, District 1 (Location)
·        Area square:

(Total land, water surface to be used)

·        Projected Investment: VND 527 billion

(The expected investment capital, denominated in VND and USD)

·        Investment type: BT

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

·        Objectives: Complete the traffic infrastructure as planned for socio-economic development.

(Project objective)

·        General information: Repairing a road of length 3.78km, width from 35m to 50m

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

·        Pictures: master plan, map, design, illustration … (PC file formats, quality and size enough for printing)

(Image: master plan, map, design, illustration … (PC format, quality and size enough for printing) 

·        Contact agency: City People’s Committee, Department of Planning and Investment, Department of Transportation and Communication

(Contact agency)

 

PROJECT INFORMATION FORM

(Project information form)

·        Project type: Transport infrastructure

(Project type: for example: Infrastructure – Urban Railway, Infrastructure – Ports, Housing, Health care…).

·        Project Name: Road along the bank of Sài Gòn River

(Project name)

Location: Bình Thạnh District, District 1.

(Location)

·        Area square:

(Total land, water surface to be used)

·        Projected Investment: VND 696 billion

(The expected investment capital, denominated in VND and USD)

·        Investment type: BT

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

·        Objectives: Complete the traffic infrastructure as planned for socio-economic development.

(Project objective)

·        General information: 

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

·        Pictures: master plan, map, design, illustration … (PC file formats, quality and size enough for printing)

(Image: master plan, map, design, illustration … (PC format, quality and size enough for printing) 

·        Contact agency: City People’s Committee, Department of Planning and Investment, Department of Transportation and Communication

(Contact agency)

 

PROJECT INFORMATION FORM

(Project information form)

·        Project type: Transport infrastructure

(Project type: for example: Infrastructure – Urban Railway, Infrastructure – Ports, Housing, Health care…).

·        Project Name: The interchange at Trường Sơn road – road connecting Tân Sơn Nhất, Bình Lợi, the outer belt road

(Project name)

Location:

(Location)

·        Area square:

(Total land, water surface to be used)

·        Projected Investment: VND 772 billion

(The expected investment capital, denominated in VND and USD)

·        Investment type: BT

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

·        Objectives: Complete the traffic infrastructure as planned for socio-economic development.

(Project objective)

·        General information: Phase 1: Constructing a 1-way direct overpass (steel bridge) in Y shape from Trường Sơn road (length: 99.66m, width: 11.5m) to the national station (length: 99.66m, width: 8m) and 1 branch into the international station (length: 219m, width: 8m). Phase 2: Constructing a subway crossing Trường Sơn road from the national station toward Hồng Hà with width of 6.5m, length in closed section of 40m, in the open section of 100m for each end and retaining wall of 60m for each end, total length of the subway: 390m (including retaining dike)

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

·        Pictures: master plan, map, design, illustration … (PC file formats, quality and size enough for printing)

(Image: master plan, map, design, illustration … (PC format, quality and size enough for printing) 

·        Contact agency: City People’s Committee, Department of Planning and Investment, Department of Transportation and Communication

(Contact agency)

 

PROJECT INFORMATION FORM

(Project information form)

·        Project type: Urban technical infrastructure

(Project type: for example: Infrastructure – Urban Railway, Infrastructure – Ports, Housing, Health care…).

·        Project Name: The Investment project to replace the system of urban lights with a system of power-saving intelligent lights

(Project name)

Location:

(Location)

·        Area square:

(Total land, water surface to be used)

·        Projected Investment: VND 2,111 billion

(The expected investment capital, denominated in VND and USD)

·        Investment type: BLT

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

·        Objectives: Complete the traffic infrastructure as planned for socio-economic development.

(Project objective)

General information: Replacing all the old system of urban lights with capacities of 70-400W with power-saving intelligent Led lights with capacity of 30-185W.

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

·        Pictures: master plan, map, design, illustration … (PC file formats, quality and size enough for printing)

(Image: master plan, map, design, illustration … (PC format, quality and size enough for printing) 

·        Contact agency: City People’s Committee, Department of Planning and Investment, Department of Transportation and Communication

(Contact agency)

 

PROJECT INFORMATION FORM

(Project information form)

·        Project type: Urban technical infrastructure

(Project type: for example: Infrastructure – Urban Railway, Infrastructure – Ports, Housing, Health care…).

·        Project Name: Tân Hóa – Lò Gốm Basin Wastewater Collection and Treatment System

(Project name)

Location:

(Location)

·        Area square:

(Total land, water surface to be used)

·        Projected Investment: VND 5,100 billion

(The expected investment capital, denominated in VND and USD)

·        Investment type: BOT or BOT combined with BT

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

·        Objectives: Complete the traffic infrastructure as planned for socio-economic development.

(Project objective)

General information: Capacity in phase 1 (2020): 168,000m3/day. Capacity in phase 2 (2030) : 270.000m3/day

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

·        Pictures: master plan, map, design, illustration … (PC file formats, quality and size enough for printing)

(Image: master plan, map, design, illustration … (PC format, quality and size enough for printing) 

·        Contact agency: City People’s Committee, Department of Planning and Investment, Department of Transportation and Communication

(Contact agency)

 

PROJECT INFORMATION FORM

(Project information form)

·        Project type: Urban technical infrastructure

(Project type: for example: Infrastructure – Urban Railway, Infrastructure – Ports, Housing, Health care…).

·        Project Name: Tân Bình Wastewater treatment plant

(Project name)

Location: Bình Tân District

(Location)

·        Area square:

(Total land, water surface to be used)

·        Projected Investment: VND 6,500 billion

(The expected investment capital, denominated in VND and USD)

·        Investment type: BT

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

·        Objectives: Complete the traffic infrastructure as planned for socio-economic development.

(Project objective)

General information: Capacity: 180,000m3/day

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

·        Pictures: master plan, map, design, illustration … (PC file formats, quality and size enough for printing)

(Image: master plan, map, design, illustration … (PC format, quality and size enough for printing) 

·        Contact agency: City People’s Committee, Department of Planning and Investment, Department of Transportation and Communication

(Contact agency)

 

PROJECT INFORMATION FORM

(Project information form)

·        Project type: Urban technical infrastructure

(Project type: for example: Infrastructure – Urban Railway, Infrastructure – Ports, Housing, Health care…).

·        Project Name: West of Sài Gòn wastewater treatment plant

(Project name)

Location: Bình Tân District

(Location)

·        Area square:

(Total land, water surface to be used)

·        Projected Investment:  VND 2,400 billion (including site clearance of VND 800 billion)

(The expected investment capital, denominated in VND and USD)

·        Investment type: BT

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

·        Objectives: Complete the traffic infrastructure as planned for socio-economic development.

(Project objective)

General information: Capacity in phase 1 (2020) : 138,000m3/day; Capacity in phase 2 (2030) : 230,000m3/day

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

·        Pictures: master plan, map, design, illustration … (PC file formats, quality and size enough for printing)

(Image: master plan, map, design, illustration … (PC format, quality and size enough for printing) 

·        Contact agency: City People’s Committee, Department of Planning and Investment, Department of Transportation and Communication

(Contact agency)

 

PROJECT INFORMATION FORM

(Project information form)

·        Project type: Urban technical infrastructure

(Project type: for example: Infrastructure – Urban Railway, Infrastructure – Ports, Housing, Health care…).

·        Project Name: North of Sài Gòn wastewater treatment plant 1

(Project name)

Location: Bình Tân District

(Location)

·        Area square:

(Total land, water surface to be used)

·        Projected Investment:  VND 2,700 billion (including site clearance of VND 900 billion)

(The expected investment capital, denominated in VND and USD)

·        Investment type: BT

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

·        Objectives: Complete the traffic infrastructure as planned for socio-economic development.

(Project objective)

General information: Capacity in phase 1 (2020) : 142,000m3/day; Capacity in phase 2 (2030) : 230,000m3/day

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

·        Pictures: master plan, map, design, illustration … (PC file formats, quality and size enough for printing)

(Image: master plan, map, design, illustration … (PC format, quality and size enough for printing) 

·        Contact agency: City People’s Committee, Department of Planning and Investment, Department of Transportation and Communication

(Contact agency)

 

PROJECT INFORMATION FORM

(Project information form)

·        Project type: Transport infrastructure

(Project type: for example: Infrastructure – Urban Railway, Infrastructure – Ports, Housing, Health care…).

·        Project Name: Inter-provincial road 14 (Phạm Văn Hớn road)

(Project name)

Location: Hóc Môn District

(Location)

·        Area square:

(Total land, water surface to be used)

·        Projected Investment:  VND 2,100 billion (including site clearance of VND 1,200 billion)

(The expected investment capital, denominated in VND and USD)

·        Investment type: BT

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

·        Objectives: Complete the traffic infrastructure as planned for socio-economic development.

(Project objective)

General information: Road length 4.5km; Cross section: 40m

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

·        Pictures: master plan, map, design, illustration … (PC file formats, quality and size enough for printing)

(Image: master plan, map, design, illustration … (PC format, quality and size enough for printing) 

·        Contact agency: City People’s Committee, Department of Planning and Investment, Department of Transportation and Communication

(Contact agency)

 

PROJECT INFORMATION FORM

(Project information form)

·        Project type: Transport infrastructure

(Project type: for example: Infrastructure – Urban Railway, Infrastructure – Ports, Housing, Health care…).

·        Project Name: Trịnh Thị Miếng Road (new Inter-provincial road 15)

(Project name)

Location: Hóc Môn District

(Location)

·        Area square:

(Total land, water surface to be used)

·        Projected Investment:  VND 512 billion

(The expected investment capital, denominated in VND and USD)

·        Investment type: BOT or BOT combined with BT

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

·        Objectives: Complete the traffic infrastructure as planned for socio-economic development.

(Project objective)

General information: Road length 6 km; Cross section: 35m

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

·        Pictures: master plan, map, design, illustration … (PC file formats, quality and size enough for printing)

(Image: master plan, map, design, illustration … (PC format, quality and size enough for printing) 

·        Contact agency: City People’s Committee, Department of Planning and Investment, Department of Transportation and Communication

(Contact agency)

 

PROJECT INFORMATION FORM

(Project information form)

·        Project type: Transport infrastructure

(Project type: for example: Infrastructure – Urban Railway, Infrastructure – Ports, Housing, Health care…).

·        Project Name: Inter-provincial road 15 (from Xáng bridge to Bến Nảy bridge)

(Project name)

Location: Củ Chi District

(Location)

·        Area square:

(Total land, water surface to be used)

·        Projected Investment:  VND 3,119 billion (including site clearance of VND 1,126 billion)

(The expected investment capital, denominated in VND and USD)

·        Investment type: BOT or BOT combined with BT

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

·        Objectives: Complete the traffic infrastructure as planned for socio-economic development.

(Project objective)

General information: Road length 11.9 km; Cross section: 35m

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

·        Pictures: master plan, map, design, illustration … (PC file formats, quality and size enough for printing)

(Image: master plan, map, design, illustration … (PC format, quality and size enough for printing) 

·        Contact agency: City People’s Committee, Department of Planning and Investment, Department of Transportation and Communication

(Contact agency)

 

PROJECT INFORMATION FORM

(Project information form)

·        Project type: Transport infrastructure

(Project type: for example: Infrastructure – Urban Railway, Infrastructure – Ports, Housing, Health care…).

·        Project Name: Inter-provincial road l5 (from Bến Nảy bridge to Inter-provincial road 7 bridge)

(Project name)

Location: Củ Chi District

(Location)

·        Area square:

(Total land, water surface to be used)

·        Projected Investment:  VND 2828 billion (Including site clearance of VND 990 billion)

(The expected investment capital, denominated in VND and USD)

·        Investment type: BOT or BOT combined with BT

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

·        Objectives: Complete the traffic infrastructure as planned for socio-economic development.

(Project objective)

General information: Road length 10.45  km; Cross section: 35m

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

·        Pictures: master plan, map, design, illustration … (PC file formats, quality and size enough for printing)

(Image: master plan, map, design, illustration … (PC format, quality and size enough for printing) 

·        Contact agency: City People’s Committee, Department of Planning and Investment, Department of Transportation and Communication

(Contact agency)

 

Name of the relevant project: TRADE SERVICE AND TECHNICAL SUPPORT CENTER
Project type Socialization – calling for domestic and international investment
Location and area Lot T4, bordering axis road D2 (Road boundary 50m), road D12 (Road boundary expectedly 40m) and road D15 (Road boundary expectedly 27m).

Expected size: 9.83 ha

Contact address SAIGON HI-TECH PARK MANAGEMENT BOARD
Address: Lot T2-3, D1 Street, Saigon Hi-Tech Park, Tân Phú Ward, District 9, Hồ Chí Minh City, Vietnam.Tel: (+84 8) 3736 0293Fax: (+84 8) 3736 0292E–mail: xtdt.shtp@tphcm.gov.vnWebsite: www.shtp.hochiminhcity.gov.vn
Objectives of investment Trade- Service Area up to international standards for the following activities:
1) Smart building to provide high-class network services, data for logistic activities, transactions, enterprise management;
2) Trade – services: Office leasing, technology transfer services, transfers of inventions, patents.3) Conventions, workshops, and technological exhibitions4) Artistic centers, museums.5) Other services and activities providing added values to the socio-economic development projects of the city, which are new, creative, and suitable with the position of the Saigon Hi-tech Park inside a Scientific and technological city and being a symbol at the East gate of the city as suggested by investors and considered by the Management Unit of the Saigon Hi-tech Park.
Form of calling for investment –  Calling for investment from domestic and international investors.

–  The Management Board of Ho Chi Minh City Hi-Tech Park shall guide investors to file investment registration procedures.

–  In case there are many investors interested in the project, the Saigon Hi-tech Park Management Board will hold a bidding to select investors.

Requirements for investors:

 

–  Having financial capacity to implement the project

–  Having experience in implementing similar projects

–  Integrated services that create added value for Saigon Hi-tech Park.

–  The project has unique design, creating highlights, symbol of Saigon Hi-Tech Park.

Construction density 40%.
Minimum height ​02 floors.
Maximum height ​16 floors
Land use coefficient ​3.0
Building setback space –    Road D2: 20m.

–    Road D12: 20m.

–    Road D15: 15m.

Investment preferences –  Investors will be entitled to preferences in corporate income tax 10% within 15 years, of which 4 first years will be free of tax (0%) and 9 next years will be decreased by 50% (05%).

–  Additionally, investors will be free of import taxes for:

+ Machines, equipment, transport means for special uses (Over 24 seats) to be imported as fixed assets.

+ Raw materials as fixed assets which cannot be produced in Vietnam.
+ Semi-finished product, components to be imported to fabricate finished products.

Planning and approvals Decision No. 34/QD-KCNC dated 26/02/2016 on the partial adjustment of the zoning plan: 1/2000 of Saigon Hi-Tech Park – Phase II: The area affecting the investment project of Samsung Electronics Corporation (revising and supplementing the Decision No. 193/QD-KCNC dated 23/7/2015).
Land lease rate US $ 1.6/square meter/year. Investors will do land filling and leveling by themselves
Current state Land has not been leveled yet.
Image

 

 

Name of the relevant project: RESIDENTIAL HOUSE AREA FOR WORKERS IN HIGH-TECH PARK (20.17 ha)
Project type Socialization – calling for domestic and international investment
Location and area 1.  Location:

The location and boundaries of the land plot are shown on the status map No. 40024-2/GD-TNMT dated 17/08/2010 approved by the Department of Natural Resources and Environment. (Decision No. 4290/QD – UBND dated 01/10/2010 of the City’s People’s Committee)

2. Land plot area: 201,724 m2

Contact address SAIGON HI-TECH PARK MANAGEMENT BOARD
Address: Lot T2-3, D1 Street, Saigon Hi-Tech Park, Tân Phú Ward, District 9, Hồ Chí Minh City, Vietnam.Tel: (+84 8) 3736 0293Fax: (+84 8) 3736 0292E–mail: xtdt.shtp@tphcm.gov.vnWebsite: www.shtp.hochiminhcity.gov.vn
Objectives of investment Building completed hostels for lease to the workers who work in Saigon Hi-Tech Park. They include the following facilities:

– The residential zone

– The concentrated green parks and sports zone

– Public works: Kindergarten, Primary School, business service center, operating zone of the whole area, clinics, gym and sports clubs

Form of calling for investment – Calling for investment from domestic and international investors.

– The Saigon Hi-tech Park Management Board shall guide investors to file investment registration procedures.

– In case there are many investors interested in the project, the Saigon Hi-tech Park Management Board will hold a bidding to select investors.

Requirements for investors: –                  – Having financial capacity to implement the project

–                  – Having experience in implementing similar projects

–                  – Implementing the project well on schedule

Investment preferences The investors who are selected to implement the projects will be entitled to incentives according to Article 9 of the Governmental Decree No. 100/2015/ND-CP dated 20/10/2015 on development and management of social housing.
Land lease rate Land rental exemption
Current state The investors who are selected to implement the projects will carry out the construction of technical infrastructure of the entire land area
Image There is no specific image

 

Name of the relevant project: GREEN PATCH
Project type Socialization – calling for domestic and international investment
Location and area Cluster G – Saigon Hi-tech Park

Expected size: 81.4 ha

Contact address SAIGON HI-TECH PARK MANAGEMENT BOARD
Address: Lot T2-3, D1 Street, Saigon Hi-Tech Park, Tân Phú Ward, District 9, Hồ Chí Minh City, Vietnam.Tel: (+84 8) 3736 0293Fax: (+84 8) 3736 0292E–mail: xtdt.shtp@tphcm.gov.vnWebsite: www.shtp.hochiminhcity.gov.vn
Objectives of investment Establishing zones of parks – green plants, water surface under approved planning.

– Being a place providing spaces for rest, living to labors working in the Saigon Hi-tech Park.

– Creating green, clean, and amusement areas for local communities.

– Being a nursery place for green plants to be provided to projects inside and outside the Saigon Hi-tech Park

Form of calling for investment –  Calling for investment from domestic and international investors.

–  The Management Board of Ho Chi Minh City Hi-Tech Park shall guide investors to file investment registration procedures.

–  In case there are many investors interested in the project, the Saigon Hi-tech Park Management Board will hold a bidding to select investors.

Requirements for investors:

 

+ Encouraging investment in clusters (including multiple G areas), or each individual G area.

+  Having capacity, experience in the field of park – green tree, water surface and service exploitation.

+ Having investment plan meeting the specified criteria.

Construction density 10%
Maximum height ​2 floors.
Land use coefficient 0.1
Investment preferences –  Investors will be entitled to preferences in corporate income tax 10% within 15 years, of which 4 first years will be free of tax (0%) and 9 next years will be decreased by 50% (05%).

–  Additionally, investors will be free of import taxes for:

+ Machines, equipment, transport means for special uses (Over 24 seats) to be imported as fixed assets.

+ Raw materials as fixed assets which cannot be produced in Vietnam.
+ Semi-finished product, components to be imported to fabricate finished products.

Planning and approvals – The Management Board is preparing a dossier for adjustment of the 1/2000 scale planning of the hi-tech park to submit to the City People’s Committee for approval according to regulations.
Land lease rate $ 1.1 USD – $ 1.6 USD / square meter / year for 10% of construction density. Investors will do land filling and leveling by themselves
Current state The land has not been leveled yet.

Roads D1, road D2, road D14A have been completed in transport roads, sidewalks, lighting and technical infrastructure.

Image

 

PROJECT INFORMATION FORM

(Project information form)

·        Project type: Urban technical infrastructure

(Project type: for example: Infrastructure – Urban Railway, Infrastructure – Ports, Housing, Health care…).

·        Project Name: Rạch Tra Sluice gate for tidal control

(Project name)

Location: Củ Chi District, Hóc Môn District

(Location)

·        Area square:

(Total land, water surface to be used)

·        Projected Investment: VND 1,122 billion (US$ 51 million)

(The expected investment capital, denominated in VND and USD)

·        Investment type: ODA, PPP,…

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

·        Objectives:

(Project objective)

General information: Technical specifications: Drainage width: 2×40 m, bottom elevation: 5m. Decision No. 5754/QĐ-UBND dated 12/11/2012 of the People’s Committee of the city on approving the portfolio of investment projects under BOT and BT form in the city

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

·        Pictures: master plan, map, design, illustration … (PC file formats, quality and size enough for printing)

(Image: master plan, map, design, illustration … (PC format, quality and size enough for printing) 

·        Contact agency: Department of Transportation and Communication

(Contact agency)

 

PROJECT INFORMATION FORM

(Project information form)

·        Project type: Transport infrastructure

(Project type: for example: Infrastructure – Urban Railway, Infrastructure – Ports, Housing, Health care…).

·        Project Name: Constructing Nguyễn Văn Linh intersection – Phạm Hùng, Bình Chánh

(Project name)

Location: Bình Chánh District

(Location)

·        Area square:

(Total land, water surface to be used)

·        Projected Investment: VND 753 billion (equivalent to USD 34 million)

(The expected investment capital, denominated in VND and USD)

·        Investment type:

(Form of investment, ODA, PPP, OBT, FDI and other forms proposed by the Investor)

·        Objectives: Constructing Nguyễn Văn Linh intersection – Phạm Hùng in order to satisfy traffic needs in the area

(Project objective)

General information: 

– HC1 underpass on Nguyễn Văn Linh Street – in the direction from Nguyễn Văn Linh  Street – Highway 1A to Tân Thuận Export Processing Zone.

– HC2 underpass on Nguyễn Văn Linh Street – toward Tân Thuận EPZ via National Highway 1A

– Constructing the central roundabout

(General information on the project: Policy to call for investment, planning information, land compensation and clearance, project operation term, investment preferences (if any)…)

·        Pictures: master plan, map, design, illustration … (PC file formats, quality and size enough for printing)

(Image: master plan, map, design, illustration … (PC format, quality and size enough for printing) 

·        Contact agency: Urban Traffic Control Section No.4

(Contact agency)

 

 

 

 

 

 

THỦ THIÊM NEW URBAN AREA PROJECT

 

1.     Project type: Tourism
2.  Project title:

The Project of urban resort hotels

3.  Location:

The land lot has the number 7-1 and is in the Functional area no. 7 in Thủ Thiêm new urban area; parcel no. 3, map no. 36 of Bình Khánh Ward. The Project is constructed on a separate land lot where is the current combination of Canals in the East of Thủ Thiêm new urban area, with water traffic routes around the land lot.

4.  Total land area: 6.8 ha
5.     Project objectives:

Constructing high-class hotels for domestic and foreign tourists

6.     The expected investment capital: VND 2,760 billion (equivalent to USD 125 million)
7.     General information on the project:

The investors who are selected to implement the projects will carry out the planning and submit the planning for approval according to regulations. Some planning criteria (under the approved allocating plan at ratio 1/2000)

8.  Form of investment:

Call for domestic and foreign investments to implement the investment project with land use (in form of land use right auction)

9.  Contact address:

Thủ Thiêm New Urban Area Investment – Construction Management Board

Address: No. 177 Lý Chính Thắng, Ward 7, District 3, Hồ Chí Minh City.

Tel: 84.8.35 261 299; Fax: 84.8.35 261 272

 

1.  Project type: Education – Training
2.  Project title:

Constructing schools up to international standards

3.  Location:

The land lot No. 4-1 is in the Functional area No. 4 in Thủ Thiêm new urban area, District 2, HCMC.

Project is located at the Canal no. 3 in the Northern residential area, at a nice and quiet location, suitable for education of knowledge, physical exercises as well as encouragement of learning spirit and nature love

4.  Total land area: 2 ha
5.     Project objectives:

Constructing vocational basic secondary school

6.     The expected investment capital: VND 200 billion (equivalent to US$ 9 million)
7.     General information on the project:

The investors who are selected to implement the projects will carry out the planning and submit the planning for approval according to regulations. Some planning criteria (under the approved allocating plan at ratio 1/2000)

– Area of land for project development: 20,124 m2

– Area of constructed floor: 10,000 m2

– Floor area ratio (FAR) : 0.50

– Number of floors: 4 floors

8.  Form of investment:

Call for domestic and foreign investments to implement the investment project with land use (in form of land use right auction) the land lot no.

9.  Contact address:

Thủ Thiêm New Urban Area Investment – Construction Management Board

Address: No. 177 Lý Chính Thắng, Ward 7, District 3, Hồ Chí Minh City.

Tel: 84.8.35 261 299; Fax: 84.8.35 261 272

 

1.  Project type: Education – Training
2.  Project title:

Constructing schools up to international standards

3.  Location:

The land lot No. 3-4 is in the Functional area No. 3 in Thủ Thiêm new urban area, District 2, HCMC.

Project is located right next to the central lake in the Northern residential area, at a nice and quiet location, suitable for education of knowledge, physical exercises as well as encouragement of learning spirit and nature love

4.  Total land area: 1.4 ha
5.     Project objectives:

Constructing basic primary-to-secondary schools

6.     The expected investment capital: VND 100 billion (equivalent to US$ 5 million)
7.     General information on the project:

The investors who are selected to implement the projects will carry out the planning and submit the planning for approval according to regulations. Some planning criteria (under the approved allocating plan at ratio 1/2000)

– Area of land for project development: 13,539 m2

– Area of constructed floor: 10,000 m2

– Floor area ratio (FAR) : 0,74

– Number of floors: 4-6 floors

8.  Form of investment:

Call for domestic and foreign investments to implement the investment project with land use (in form of land use right auction) the land lot no.

9.  Contact address:

Thủ Thiêm New Urban Area Investment – Construction Management Board

Address: No. 177 Lý Chính Thắng, Ward 7, District 3, Hồ Chí Minh City.

Tel: 84.8.35 261 299; Fax: 84.8.35 261 272

 

 

NEWLY ADDED PROJECTS

 

1.  Project type: Education – Training
2.  Project title:

Education project 44.26 ha

3.  Location:

North-Western Urban Area

4.  Total land area: 44.26
5.     Project objectives:

Constructing educational institutions of different levels in the North-Western Urban Area

6.     The expected investment capital: TBD
7.     General information on the project:

Current land status: not yet finished in land compensation and clearance

8.  Form of investment:

PPP, socializations and other forms proposed by the Investor…

9.  Contact address:

North-Western Urban Area Management Board

 

1.  Project type: Education – Training
2.  Project title:

Education project 85.26 ha

3.  Location:

North-Western Urban Area

4.  Total land area: 85.26 ha
5.     Project objectives:

Constructing educational institutions of different levels in the North-Western Urban Area

6.     The expected investment capital: TBD
7.     General information on the project:

Current land status: not yet finished in land compensation and clearance

8.  Form of investment:

PPP, socializations and other forms proposed by the Investor…

9.  Contact address:

North-Western Urban Area Management Board

 

1.  Project type: land use
2.  Project title:

Residential – multiple functional trading

3.  Location:

Thủ Thiêm New Urban Area

4.  Total land area: 92,428 m2
5.     Project objectives:

Constructing residential and multiple functional trading area

6.     The expected investment capital: TBD
7.     General information on the project:

Some planning criteria (under the approved allocating plan at ratio 1/2000)

– Area of land for project development: 92,428 m2

– Area of constructed floors: 817,500

– Floor area ratio (FAR) : 9,43

– Number of floors: 10-50 floors

8.  Form of investment:

Call for domestic and foreign investments to implement the investment project with land use (in form of land use right auction) the land lot no.

9.  Contact address:

Thủ Thiêm New Urban Area Investment – Construction Management Board

Address: No. 177 Lý Chính Thắng, Ward 7, District 3, Hồ Chí Minh City.

Tel: 84.8.35 261 299; Fax: 84.8.35 261 272

 

1.  Project type:
2.  Project title:

Giồng Ông Tố Bridge and intersections at both ends of the Bridge

3.  Location:

District 2

4.  Total land area:
5.     Project objectives:
6.     Expected total investment:
7.     General information on the project:
8.  Form of investment:

 

9.  Contact address:

District 2

 

1.  Project type:
2.  Project title:

Road along Sài Gòn River (the section from Hàm Long artisan village project to Phú Mỹ Bridge)

3.  Location:

District 2

4.  Total land area:
5.     Project objectives:
6.     Expected total investment:
7.     General information on the project:
8.  Form of investment:

 

9.  Contact address:

District 2

 

1.  Project type:
2.  Project title:

The Parallel Road in the North along Hồ Chí Minh – Long Thành – Dầu Giây Expressway

3.  Location:

District 2

4.  Total land area:
5.     Project objectives:
6.     Expected total investment:
7.     General information on the project:
8.  Form of investment:

 

9.  Contact address:

District 2

 

1.  Project type:
2.  Project title:

Đỗ Xuân Hợp Road, building line: 30:40m (the road section from Xuyên Tâm Road to Nam Lý Bridge)

3.  Location:

District 2

4.  Total land area:
5.     Project objectives:
6.     Expected total investment:
7.     General information on the project:
8.  Form of investment:

 

9.  Contact address:

District 2

 

1.   Project type:
2.   Project title:

Shallow port area

3.   Location:

PO Lot, bordered by Ông Nhiều River, District 9

4.   Total land area:

6 ha

The length of the ports is 1.500 m (expected 05 ports).

5.  Project objectives:

Size of the works:

+ Warehouse, container yards

+ Barge dock area

+ Operational office area

+ Transport infrastructure

6.  Expected total investment:
7.  General information on the project:

Size of the port: Type II inland marine port (Circular No. 61/2014/TT-BGTVT dated 07/11/2014 of the Ministry of Transport regulating the classification criteria of inland marine ports and publication of the inland marine harbors

The projected maximum capacity: 800 containers/day and night (mainly for investors in High-tech Zone).

Planning: Official Letter No. 586/UBND-DT dated 09/02/2017 of the City’s People’s Committee to the Ministry of Transport about the plan for development of shallow port system by 2020, oriented to the year 2030

8.   Form of investment:

– Calling for investment from domestic and international investors.

– The Saigon Hi-tech Park Management Board shall guide investors to file investment registration procedures.

– In case there are many investors interested in the project, the Saigon Hi-tech Park Management Board will hold a bidding to select investors.

9.   Requirements for investors:

– Having financial capacity to implement the project

– Having experience in implementing similar projects

– Implementing the project well on schedule

10.  Contact address:

Saigon Hi-tech Park Management Board

Address: Lot T2-3, D1 Street, Saigon Hi-Tech Park, Tân Phú Ward, District 9, Hồ Chí Minh City

Tel: (+84) 3736 0293

Fax: (+848) 3736 0292

Email: xtdt.shtp@tphcm.gov.vn

Website: www.shtp.hochiminhcity.gov.vn

 

1.     Project type:
2.     Project title:

Duong Cong Khi Industrial Complex

3.     Location:

Xuân Thới Thượng Commune – Hóc Môn District

4.     Total land area: 46.41 ha
5.     The objective of the project: Investment in constructing infrastructure (technical, transportation…)
6.     Expected total investment:
7.     General information on the project:
8.     Form of investment: PPP

 

9.     Contact address:

Department of Industry and Trade of HCMC

Address: 163 Hai Bà Trưng, W6, D3, HCMC

 

1.     Project type:
2.     Project title:

Hưng Long University Area

3.     Location:

Hưng Long Commune, Bình Chánh District

4.     Total land area: 511.0 ha
5.     Project objective: Removing universities and colleges currently in the city; being the area of universities, colleges and research institutes
6.     The expected investment capital: TBD
7.     General information of the project: The land has not yet been compensated for site clearance; The City’s People’s Committee has approved the task of planning: scale: 1/2000 in the decision No. 1395/QD-UBND dated 25/03/2016
8.     Form of investment: TBD
9.     Contact address:

Management Authority of Southern Area Development

 

 

1.     Project type:
2.     Project title:

The downtown and residential area West of the City

3.     Location:

Tân Kiên Commune, Bình Chánh District

4.     Total land area: 239.9 ha
5.     Project objective: the City-level center area to the West (Service Trading Finance and Office Center, tourist culture service center; exhibition, research, agricultural development assistance center; Sports Center; mixed service center, …); existing residential and new residential area; Bình Chánh development dynamic axis
6.     The expected investment capital: TBD
7.     Project information: There is no resource for implementing the planning; newly built residential areas. HTKT & HTXH has not yet been compensated with regard to site clearance;  The People’s Committee has approved the zoning planning: scale: 1/2000 in the Decision No. 4956/QD-UBND dated 11/09/2013
8.     Form of investment: TBD
9.     Contact address:

Bình Chánh District’s People’s Committee

 

 

1.     Project type:
2.     Project title:

Cần Giờ Resort and Tourist Site – Cần Giờ Prograding Urban Area

3.     Location:

Cần Giờ District

4.     Total land area: 73.3 Km2
5.     Project objective: Developing the economy of Cần Giờ District and Hồ Chí Minh City towards a breakthrough in tourism, entertainment and service economy.
6.     The expected investment capital: Unknown
7.     General information of the project: The contest for the best planning is under way, and the zoning planning: scale: 1/2000 is under establishment for the prograding zone of 2780ha
8.     Form of investment: TBD
9.     Contact address:

People’s Committee of Cần Giờ District

 

 

10.               Project type:
11.              Project title:

Saigon Safari Park

12.              Location:

Củ Chi District

13.              Total land area: 456.34 ha
14.              Project objective: Building an urban park
15.              The expected investment capital: Unknown
16.              General information of the project: Clean land, and the construction site zoning planning, scale: 1/2000 has been approved
17.              Form of investment: unknown
18.              Contact address:

DPI

 

 

1.     Project type:
2.     Project title:

Expanding and upgrading Nguyễn Thị Rành Road

3.     Location:

The section through Saigon Safari Park

4.     Total land area:
5.     Project objectives: Investing in urban technical infrastructure for economic development in Củ Chi District
6.     The expected investment capital: Unknown
7.     General information of the project: Clean land, and the construction site zoning planning, scale: 1/2000 has been approved
Form of investment: unknown
8.     Contact address:

DPI

 

 

1.     Project type:
2.     Project title:

Expanding and upgrading Tam Tân Road

3.     Location:

The section of the North West Urban Area of the City

4.     Total land area:
5.     Project objective: Investing in technical infrastructure for development of the North West Urban Area of the City
6.     The expected investment capital: Unknown
7.     General information of the project: The land has not yet been compensated; the site zoning planning, scale: 1/2000 has been approved
8.     Form of investment: unknown
9.     Contact address:

North West Urban Area Management Board

 

 

1.     Project type:
2.     Project title:

Compensation for site clearance and resettlement for separation greenery in Đa Phước waste treatment complex and cemetery

3.     Location:

Đa Phước Waste treatment complex and cemetery

4.     Total land area: 268ha
5.     Project objectives:
6.     The expected investment capital: VND1,069 billion
7.     General information on the project:
8.     Form of investment:
9.     Contact address:

Department of Finance; Department of Planning and investment; Bình Chánh People’s Committee; Bình Chánh District Committee for Site Clearance Compensation; the City’s Compensation Appraisal Council

10.              Notes (schedule, status): City People’s Committee, Document No. 4644/UBND -TMT dated 10/08/2015 approving the policy to continue implementing the project. The People’s Council of the City has approved the policy in the Resolution No. 07/NQ-HDND dated 21/04/2016. The project has been allocated VND 2 billion for investment preparation

 

 

1.     Project type:
2.     Project title:

The project of planting separation greenery in Đa Phước solid waste treatment complex and cemetery

3.     Location:

Đa Phước Waste treatment complex and cemetery

4.     Total land area: 268ha
5.     Project objectives:
6.     The expected investment capital: VND 90 billion
7.     General information on the project:
8.     Form of investment:
9.     Contact address:

Department of Finance; Department of Planning and Investment;  Bình Chánh People’s Committee; Department of Agriculture and Rural Development.

10.               Notes (Schedule, status): The People’s Council of the City has approved the policy in the Resolution No. 07/NQ-HDND dated 21/04/2016. The project has been allocated VND 100 million for investment preparation

 

 

1.     Project type:
2.     Project title:

The project of site clearance compensation in phase 2 for separation greenery in Northwest City solid waste treatment complex, Củ Chi District

3.     Location:

Northwest City solid waste treatment complex, Củ Chi District

4.     Total land area: 197 ha
5.     Project objectives:
6.     The expected investment capital: VND 526 billion
7.     General information on the project:
8.     Form of investment:
9.     Contact address:

Department of Finance; Department of Planning and investment; Củ Chi People’s Committee; Củ Chi District Committee for Site Clearance Compensation; the City’s Compensation Appraisal Council

10.               Notes (schedule, status): The project has been approved by the City People’s Committee in terms of the policy to continue implementation in the Document No. 4643/UBND -DTMT dated 10/08/2015. The People’s Council of the City has approved the policy in the Resolution No. 07/NQ-HDND dated 21/04/2016. The project has been allocated VND 2 billion for investment preparation

 

 

1.     Project type:
2.     Project title:

The project of planting separation greenery in the Northwest City solid waste treatment complex, phase 2

3.     Location:

Northwest City solid waste treatment complex

4.     Total land area: 197ha
5.     Project objectives:
6.     The expected investment capital: VND 70 billion
7.     General information on the project:
8.     Form of investment:
9.     Contact address:

Departments; District People’s Committee; relevant units

10.               Notes (schedule, status): The City People’s Committee has issued Decision No. 6821/UBND-DTMT dated 29/12/2016 approving the investment policy. The project has been allocated VND 200 million for investment preparation

 

 

1.     Project type:
2.     Project title:

The project of site clearance compensation in phase 3 for separation greenery in Northwest City solid waste treatment complex, Củ Chi District

3.     Location:

Northwest City solid waste treatment complex, Củ Chi District

4.     Total land area: 67ha
5.     Project objectives:
6.     The expected investment capital: VND 350 billion
7.     General information on the project:
8.     Form of investment:
9.     Contact address:

Departments; District People’s Committee; relevant units

10.               Notes (Schedule, status): The People’s Council of the City has approved the policy in the Resolution No. 07/NQ-HDND dated 21/04/2016. The project has been allocated VND 300 million for investment preparation

 

 

1.     Project type:
2.     Project title:

The project of planting separation greenery in the Northwest City solid waste treatment complex, phase 3

3.     Location:

Northwest City solid waste treatment complex

4.     Total land area: 67ha
5.     Project objectives:
6.     The expected investment capital: VND 20 billion
7.     General information on the project:
8.     Form of investment:
9.     Contact address:

Departments; District People’s Committee; relevant units

10.               Notes (schedule, status): The City People’s Committee has issued Decision No. 6821/UBND-DTMT dated 29/12/2016 approving the investment policy. The project has been allocated VND 100 million for investment preparation

 

1.     Project type:
2.     Project title:

Calling for investment in public trash bins, public toilets on land, on rivers to meet the need of preserving the environment

3.     Location:
4.     Total land area:
5.     Project objectives:
6.     The expected investment capital: VND 600 billion
7.     General information on the project:
8.     Form of investment:
9.     Contact address:

Departments; District People’s Committee; relevant units

10.               Notes (schedule, status):

 

1.     Project type:
2.     Project title:

The project of investment in synchronous collection and transportation equipment. Transportation of domestic solid waste in the city

3.     Location:
4.     Total land area:
5.     Project objectives:
6.     The expected investment capital: VND 2,000 billion
7.     General information on the project:
8.     Form of investment:
9.     Contact address:

Departments; District People’s Committee; relevant units

10.               Notes (schedule, status):

 

1.     Project type:
2.     Project title:

The project of investing in construction of automatic air observation stations, automatic surface water observation stations and automatic groundwater observation stations to cover the observation network throughout the city.

3.     Location:
4.     Total land area:
5.     Project objectives:
6.     The expected investment capital: VND 300 billion
7.     General information on the project:
8.     Form of investment:
9.     Contact address:

Departments; District People’s Committee; relevant units

10.               Notes (schedule, status):

 

1.     Project type:
2.     Project title:

Carrying out the activities of collecting and processing hyacinth to clear the flow on Saigon River, Đồng Nai River, Vàm Cỏ Đông River and the canals between Hồ Chí Minh City and other neighboring provinces such as Bình Dương, Đồng Nai, Long An and Tây Ninh

3.     Location:

Saigon River, Đồng Nai River, Vàm Cỏ Đông River and the canals between Hồ Chí Minh City and other neighboring provinces such as Bình Dương, Đồng Nai, Long An and Tây Ninh

4.     Total land area:
5.     Project objectives:
6.     The expected investment capital: VND 110 billion
7.     General information on the project:
8.     Form of investment:
9.     Contact address:

Departments; District People’s Committee; relevant units

10.               Notes (schedule, status):

 

1.     Project type:
2.     Project title:

The project of recycling industrial waste and treating hazardous waste in municipal waste treatment complexes

3.     Location:

The City Waste Treatment Complex

4.     Total land area:
5.     Project objectives:
6.     The expected investment capital: VND 1,470 billion
7.     General information on the project:
8.     Form of investment:
9.     Contact address:

Departments; District People’s Committee; relevant units

10.               Notes (schedule, status):

 

1.     Project type:
2.     Project title:

Resettlement of the cluster of 08 apartment buildings in Thanh Đa Residential Apartment Area, Ward 27

3.     Location:

Cluster of 08 apartment buildings in Thanh Đa Residential Apartment Area, Ward 27

4.     Total land area: 73,211m2
5.     Project objectives:
6.     Expected total investment:
7.     General information of the project: Current population: 4,748 (1,427 units); Function: high-rise apartment combined with trade service complex; floor area ratio: 8; Population size: 7,948; relocated population 4,748; Population increase / decrease: 3,200; number of floors: 30, construction density (%): 40
8.     Form of investment:
9.     Contact address:

Bình Thạnh District People’s Committee

10.               Notes (schedule, status):

 

1.     Project type:
2.     Project title:

Resettling the Cluster of 15 apartment buildings in Thanh Đa Residential Apartment Area, Ward 27

3.     Location:

Cluster of 15 apartment buildings, Thanh Đa Residential Apartment Area, Ward 27

4.     Total land area: 149,350m2
5.     Project objectives:
6.     Expected total investment:
7.     General information of the project: Current population: 10,820 (2,705 units); Function: high-rise apartment combined with trade service complex; floor area ratio: 10; Population size: 17,220; relocated population 10,820; Population increase / decrease: 6,400; number of floors: 30, construction density (%): 40
8.     Form of investment:
9.     Contact address:

Bình Thạnh District People’s Committee

10.               Notes (schedule, status):

 

1.     Project type:
2.     Project title:

Resettlement of the Bank Apartment Building No. 18 Phan Chu Trinh, Ward 2

3.     Location:

The Bank Apartment Building No. 18 Phan Chu Trinh, Ward 2

4.     Total land area: 1,960m2
5.     Project objectives:
6.     Expected total investment:
7.     General information of the project: Land area suitable for planning (m2): 1,959.20; current population: 128; Planning building line: 25; Function: high-rise apartment building; index m2 / person: 4; floor area ratio: 10; Population size: 490; relocated population 236; Population increase / decrease: 254; number of floors 22, construction density (%): 45. Floor area ratio (+1.25) near Metro station <400m, 30% reserved for green park; (-1) road <26m
8.     Form of investment:
9.     Contact address:

Bình Thạnh District People’s Committee

10.               Notes (schedule, status): Resettlement for 15 households at 199/43A Lê Quang Định, Ward 7, and 12 households at the Apartment Building, 66 Trần Văn Kỳ, Ward 14

 

1.     Project type:
2.     Project title:

Resettlement of the apartment building at No. 2 Lê Quang Định, Ward 14

3.     Location:

Apartment building at No. 2 Lê Quang Định, Ward 14

4.     Total area of ​​land: 1640.8 m2 (extension of boundary) and 553.1 m2 (existing)
5.     Project objectives:
6.     Expected total investment:
1.     General information of the project: Land area suitable for planning (m2): 553.1; current population: 108; planning building line: 25-30; Function: trade-service combined with residential apartment building.

–         For the area of ​​the boundary expansion: m2 / person norm: 3; Floor area ratio: 10.5; Population size: 480; Relocated population: 204; Population increase / decrease: 276; number of floors: 18, Construction density (%): 60. Floor area ratio (+3) near Metro station<400m, site clearance;

–         For the area of ​​the existing land plot: m2 / person norm: 3; Floor area ratio: 10.5; Population size: 184; Relocated population: 108; Population increase / decrease: 76; number of floors: 18, Construction density (%): 60.

7.     Form of investment:
8.     Contact address:

Bình Thạnh District People’s Committee

9.      Notes (schedule, status): Number of floors, construction density follow Bà Chiểu Trade Center. On-site resettlement of 12 boundary expansion households and 12 households at 189/16 Hoàng Hoa Thám, Ward 6

 

2.     Project type:
3.     Project title:

Resettlement of the Apartment building in alley 23 Trần Văn Kỳ, Ward 14

4.     Location:

Apartment building in alley 23 Trần Văn Kỳ, Ward 14

5.     Total land area: 1,372.8 m2 (boundary expansion) and 1,119 m2 (existing)
6.     Project objectives:
7.     Expected total investment:
8.     General information of the project: Land area suitable for planning (m2): 1,119; current population: 160; Planning building line: 5.

–         For the area of ​​the boundary expansion: Function: high-rise apartment building; m2 / person norm: 3; Floor area ratio: 8.4; Population size: 446; Relocated population: 212; Population increase / decrease: 234; number of floors: 14, Construction density (%): 60. Floor area ratio (+2) near Metro station <400m, large plot, site clearance compensation completed; (-3) not adjoining road> 16m.

–         For the area of ​​the existing land plot: The land plot has only 01 current road less than 7.0 m, difficult to connect infrastructure and ensure fire protection; the current status should be maintained or the functions of the works should be adjusted

9.     Form of investment:
10.              Contact address:

Bình Thạnh District People’s Committee

11.               Notes (schedule, status): Resettlement of 13 additional households for boundary expansion

 

1.     Project type:
2.     Project title:

Resettlement of railway apartment building, 28 Phạm Viết Chánh, Ward 19

3.     Location:

Railway Building, 28 Phạm Viết Chánh, Ward 19

4.     Total land area: 792m2
5.     Project objectives:
6.     Expected total investment:
7.     General information of the project: Land area suitable for planning (m2): 792; current population: 60; Planning building line: 6; Function: low-rise apartment building; m2 / person norm: 3.5; floor area ratio: 4.2; Population size: 226; relocated population: 116; Population increase / decrease: 110; number of floors: 7, construction density (%): 60.
8.     Form of investment:
9.     Contact address:

Bình Thạnh District People’s Committee

10.               Notes (schedule, status): Resettlement for 08 households at No. 11/A2 XVNT, Ward 17 and 06 households at No. 02 Nguyễn Hữu Thoại, Ward 19

 

1.     Project type:
2.     Project title:

Resettlement of the Apartment Building 4B Xô Viết Nghệ Tĩnh, Ward 19 and Công Trường Hòa Bình Apartment Building. Ward 19

3.     Location:

Apartment Building 4B Xô Viết Nghệ Tĩnh, Ward 19 and Công Trường Hòa Bình Apartment Building. Ward 19

4.     Total area of ​​land: 6,549.3 m2 (extension of boundary) and 4,752.3 m2 (existing)
5.     Project objectives:
6.     Expected total investment:
7.     General information of the project: Land area suitable for planning (m2): 1,140; current population: 288; Planning building line: 30; Function: high-rise apartment building.

–         For the area of ​​the boundary expansion: m2 / person norm: 3; Floor area ratio: 10.5; Population size: 2,183; Relocated population: 1,024; Population increase / decrease: 1,057; number of floors: 25, Construction density (%): 45. Floor area ratio (+2) near Metro station<400m, site clearance compensation done;

–         For the area of ​​the existing land plot: m2 / person norm: 3; Floor area ratio: 10.5; Population size: 1,584; Relocated population: 876; Population increase / decrease: 708; number of floors: 25, Construction density (%): 45. Floor area ratio (+2) near Metro station<400m, site clearance compensation done;

8.     Form of investment:
9.     Contact address:

Bình Thạnh District People’s Committee

10.               Notes (schedule, status): resettlement of additional 37 households for boundary expansion, 16 households at 33 Nguyễn Hữu Thoại and 23 households at 06 Phạm Viết Chánh and resettlement of 16 households at 33 Nguyễn Hữu Thoại and 23 households at 06 Phạm Viết Chánh

 

1.     Project type:
2.     Project title:

Xuyên Tâm canal project

3.     Location:

Xuyên Tâm Canal

4.     Total land area:
5.     Project objectives:
6.     Expected total investment:
7.     General information on the project:
8.     Form of investment:
9.     Contact address:

Bình Thạnh District People’s Committee

10.               Notes (schedule, status): Decision No. 1025 / QD-UBND dated 10/03/2016 of the City’s People’s Committee on approval of investment project proposal.

 

1.     Project type:
2.     Project title:

Renovation of the houses on the edge of Văn Tánh canal

3.     Location:

Văn Thánh Canal

4.     Total land area:
5.     Project objectives:
6.     Expected total investment:
7.     General information on the project:
8.     Form of investment: PPP
9.     Contact address:

Bình Thạnh District People’s Committee

10.               Notes (schedule, status): According to Official Letter No. 7253/UBND-QLDA dated 26/11/2015 on proposal of renovating the houses on the edge of Văn Thánh Canal. Bình Thạnh District in the form of PPP

 

1.     Project type:
2.     Project title:

Building new headquarters of the District Party Committee, People’s Committee of Hóc Môn District

3.     Location:

Hóc Môn town

4.     Total land area: 5,020.4 m2 (excluding the building line)
5.     Project objective: Building new headquarter offices of District Party Committee, People’s Committee of Hóc Môn District to meet the working needs of staffs as well as citizens who come to work in the headquarter offices of District Party Committee, People’s Committee, also contributing to socio-economic development in Hóc Môn District
6.     The expected investment capital: VND 138,653 billion
7.     General information on the project: Total area of ​​constructed floors: 11,600 m2; 07 floors.
8.     Form of investment: PPP
9.     Contact address:

Hóc Môn District Construction Investment Management Board.

Address: No. 09, Nguyễn Thị Sóc Street, Bà Điểm Commune, Hóc Môn District. Tel: 028 38.832.908

10.               Notes (schedule, status): Applying for investment policy

 

1.     Project type:
2.     Project title:

Expanding Highway 13

3.     Location:

Hiệp Bình Chánh Ward và Hiệp Bình Phước Ward

4.     Total land area:
5.     Project objective: Completing the traffic infrastructure as planned for socio-economic development
6.     The expected investment capital: VND 6500 billion
7.     General information on the project: Expanding Highway 13 as planned
8.     Form of investment: BT
9.     Contact address:

Department of Transportation and Communication of Hồ Chí Minh City

Address: 63 Lý Tự Trọng Street, Bến Nghé Ward, District 1.

10.               Note (schedule, status): Official Letter No. 591/TB-VP dated 17/08/2017 of the Office of the District People’s Committee announcing the conclusions of the Standing People’s Committee of the District in the 33rd week meeting of the District People’s Committee on 14/08 / 2017

 

1.     Project type:
2.     Project title:

Upgrading Hóc Môn – Bắc Bình Chánh irrigation system

3.     Location:

Hóc Môn District, Bình Chánh District and Tân Bình District – Hồ Chí Minh City

4.     Total land area:
5.     Project objectives: Upgrading the irrigation system in line with the new planning and new situation in order to serve multiple sectors and multiple purposes for the development of urban agriculture, industry and people’s life, building new rural areas and meeting the conditions of climate change and sea level rise.
6.     The expected investment capital: VND 485 billion (equivalent to US$ 22.045 million
7.     General information on the project: Dredging main canal route with the total length of L = 70.18 km. – Building new and adding drains at the beginning and end of the canal. – Upgrading 05 pump stations and building 01 new pump station. – Upgrading and replacing valve gate CT3 valve into stainless steel (63 doors).
8.     Form of investment: Foreign direct investment
9.     Contact address:

Irrigation Service Operation Management Company Limited

No. 21, Highway 22, Pump Station Village, Tân Phú Trung Commune, Củ Chi District, Hồ Chí Minh City

10.               Notes (schedule, status):

 

1.     Project type:
2.     Project title:

Investment in the City’s Fisheries Center in Cần Giờ District

3.     Location:

Bình Khánh Commune, Cần Giờ District, Hồ Chí Minh City

4.     Total land area: 100ha
5.     Project objective: Establishing centers for trade and logistics for fisheries with advanced technology from other countries in the region, ensuring the aims of implementing Vietnam’s marine strategies
6.     The expected investment capital: VND 1,200 billion (equivalent to US$ 55 million)
7.     General information on the project: Constructing a fishing port and market with the area of ​​20ha along Soài Rạp River. – Constructing infrastructure for aqua-product processing factories, and logistic service facilities for fishing industry with a size of 80ha
8.     Form of investment: PPP; socialization
9.     Contact address:

Management Board of the City’s Fisheries Center directly under the Department of Agriculture and Rural Development

Level 4, 176 Hai Bà Trưng Street, Đakao Ward, District 1

10.               Notes (schedule, status): Decision No. 5754/QD-UBND dated 12/11/2012 of the People’s Committee of Hồ Chí Minh City approving the list of BOT and BT projects in the city

 

1.     Project type:
2.     Project title:

Sport area

3.     Location:

No. 2374, National Road 1, Trung Mỹ Tây Ward, District 12.

4.     Total land area: 9,807m2. Number of floors: 2 floors
5.     Project objective: Serving the improvement of health and spiritual life of officials and employees of the Center and people in the vicinity.
6.     The expected investment capital: VND 30 billion (equivalent to US$ 1.4 million)
7.     General information on the project: The project includes 01 soccer field for 11 players, 300 seat stand, one 600m2 multi-purpose sports hall, one  tennis court and ancillary facilities.
8.     Form of investment: BOT
9.     Contact address:

Center for Biotechnology

10.               Notes (schedule, status): Currently the product proposal documents have been completed and submitted to the City for approval of investment policy in the form of PPP

 

1.     Project type:
2.     Project title:

Head office: Department of Agriculture and Rural Development

3.     Location:

No. 176 Hai Bà Trưng Street and 186 Nguyễn Văn Thụ Street, District 1

4.     Total land area: 2533m2
5.     Project objective: Gathering the units under the Department of Agriculture and Rural Development to new office building. – The total number of officials, civil servants and employees is about 570 people.
6.     The expected investment capital: VND 211 billion (equivalent to US$ 10 million)
7.     General information on the project: Construction area: 1,420m2. – 01 basement for parking: 1,420m2. – Total floor area (excluding roof technical floor): 9,940 m2 (07 floors) + 1,420 m2 basement = 11,360 m2
8.     Form of investment: PPP; socialization
9.     Contact address:

Department of Agriculture and Rural Development

No. 176 Hai Bà Trưng Street, Đakao Ward, District 1, Hồ Chí Minh City

10.               Notes (schedule, status): Pending the policy for selection of project proposing units

 

1.     Project type:
2.     Project title:

Investing in technical infrastructure of Rạch Chiếc National Sport Complex

3.     Location:

An Phú Ward, District 2

4.     Total land area: 180,731ha
5.     Project objectives:
6.     The expected investment capital: VND 1,500 billion
7.     General information on the project: Constructing technical infrastructure to ensure the synchronism of architectural space, urban space and underground space … to serve as the basis for construction of sports and physical training facilities to organize events, regional and international sporting festivals
8.     Form of investment: PPP
9.     Contact address:

Department of Culture and Sports

10.               Notes (schedule, status): Group A project

 

1.     Project type:
2.     Project title:

50,000 seat stadium

3.     Location:

An Phú Ward, District 2

4.     Total land area: 10ha
5.     Project objective: Building a new stadium of 50,000 seats with integrated running track to serve the official sport events of the world, continent.
6.     The expected investment capital: VND 2,844 billion
7.     General information on the project:
8.     Form of investment: PPP
9.     Contact address:

Department of Culture and Sports

10.               Notes (schedule, status): Group A project

 

1.     Project type:
2.     Project title:

Indoor athletic arena with 10,000 seats

3.     Location:

An Phú Ward, District 2

4.     Total land area: 0.4ha
5.     Project objective: Building a 10,000-seat stadium to serve the needs of athletics training, competition and development
6.     The expected investment capital: VND 601 billion
7.     General information on the project:
8.     Form of investment: PPP
9.     Contact address:

Department of Culture and Sports

10.               Notes (schedule, status): Group B project

 

1.     Project type:
2.     Project title:

Integrated gymnasium and arena

3.     Location:

An Phú Ward, District 2

4.     Total land area: 0.32 ha
5.     Project objective: Building an integrated sport and physical training ground comprising of a main stadium (10,000 seats) and two start-up and auxiliary stadiums (each with 1,000 seats)
6.     The expected investment capital: VND 2,185 billion
7.     General information on the project:
8.     Form of investment: PPP
9.     Contact address:

Department of Culture and Sports

10.               Notes (schedule, status): Group A project

 

1.     Project type:
2.     Project title:

Pan shaped cycle track course

3.     Location:

An Phú Ward, District 2

4.     Total land area: 3.6ha
5.     Project objective: Building a pan-shaped cycle track course incorporating international standards-based stadiums to integrate motorbike race tracks for competition and serving the entertainment needs of the people.
6.     The expected investment capital: VND1,991 billion
7.     General information on the project:
8.     Form of investment: PPP
9.     Contact address:

Department of Culture and Sports

10.               Notes (schedule, status): Group A project

 

1.     Project type:
2.     Project title:

Swimming Pool + Springboard pool

3.     Location:

An Phú Ward, District 2

4.     Total land area: 0.2 ha
5.     Project objective: Building swimming pool, springboard pool for water sports training, competition and development.
6.     The expected investment capital: VND 1,365 billion
7.     General information on the project:
8.     Form of investment: PPP
9.     Contact address:

Department of Culture and Sports

10.               Notes (schedule, status): Group A project

 

1.     Project type:
2.     Project title:

Shooting and archery field complex

3.     Location:

An Phú Ward, District 2

4.     Total land area: 0.5 ha
5.     Project objective: Building a shooting and archery field complex to serve the needs of shooting and archery training, competition and development.
6.     The expected investment capital: VND 67 billion
7.     General information on the project:
8.     Form of investment: PPP
9.     Contact address:

Department of Culture and Sports

10.               Notes (schedule, status): Group B project

 

1.     Project type:
2.     Project title:

06 outdoor football fields

3.     Location:

An Phú Ward, District 2

4.     Total land area: 10ha
5.     Project objective: Investing in construction of 06 European standard football fields and cooperating with famous clubs in the world in training to supplement young football resources and contribute to taking the level of football of Hồ Chí Minh City to new heights.
6.     The expected investment capital: VND 969.9 billion
7.     General information on the project:
8.     Form of investment: PPP
9.     Contact address:

Department of Culture and Sports

10.               Notes (schedule, status): Group A project

 

1.     Project type:
2.     Project title:

Water sports complex

3.     Location:

215A Lý Thường Kiệt Street, District 11

4.     Total land area: 3ha
5.     Project objective: Building water sports complex to serve water sports training, competition and development.
6.     Expected total investment:
7.     General information on the project:
8.     Form of investment: PPP
9.     Contact address:

Department of Culture and Sports

10.               Notes (schedule, status):

 

1.     Project type:
2.     Project title:

Martial Arts Center

3.     Location:

4 Lê Đại Hành, District 11

4.     Total area: 1.6ha
5.     Project objective: Building a martial arts training area to meet the requirements of forming a modern and well-equipped Martial Arts Center, to act as a focal point for martial arts activities of the Southern region and a place for exchanging and learning martial arts with international martial arts organizations
6.     Expected total investment:
7.     General information on the project:
8.     Form of investment: PPP
9.     Contact address:

Department of Culture and Sports

10.               Notes (schedule, status):

 

1.     Project type:
2.     Project title:

Renovating and expanding Tôn Thất Thuyết road and Green Park along Tẻ Canal

3.     Location:

District 1

4.     Total land area:
5.     Project objective: Addressing the congestion and traffic accidents in the area
6.     The expected investment capital: 738
7.     General information on the project: the road: length: 3,300m, width: 15m
Embankment section: section of canal through ward 1, 3 (from dry dock alley with Khánh Hội road) is 945m long; The canal section through the wards 4,15,16,18 is 1,450m long; Green Park along Tẻ Canal
8.     Form of investment: PPP
9.     Contact address:

Department of Transportation and Communication

10.             Notes (schedule, status):

 

1.     Project type:
2.     Project title:

Construction of a road connecting Trần Quốc Hoàn – Cộng Hòa

3.     Location:

Tân Bình District

4.     Total land area:
5.     Project objective: Addressing the congestion and traffic accidents in the area
6.     The expected investment capital: 547
7.     General information on the project: Length: 4,390m, width: from 20 to 28m
8.     Form of investment: PPP
9.     Contact address:

Department of Transportation and Communication

10.             Notes (schedule, status):

 

1.     Project type:
2.     Project title:

Construction of Nguyễn Khoái road, District 4 and District 7

3.     Location:

District 4, District 7

4.     Total land area:
5.     Project objective: Addressing the congestion and traffic accidents in the area
6.     The expected investment capital: 877
7.     General information on the project: Length: 1.300m, width: 35m
8.     Form of investment: PPP
9.     Contact address:

Department of Transportation and Communication

10.             Notes (schedule, status):

 

1.     Project type:
2.     Project title:

Upgrading and expanding Dương Quảng Hàm street (the section from Bình Thạnh District to the Culture Park)

3.     Location:

Gò Vấp District

4.     Total land area:
5.     Project objective: Addressing the congestion and traffic accidents in the area
6.     The expected investment capital: 667
7.     General information on the project: Length: 2,400m, width: 40m
8.     Form of investment: PPP
9.     Contact address:

Department of Transportation and Communication

10.             Notes (schedule, status):

 

1.     Project type:
2.     Project title:

Upgrading and expanding Nguyễn Ánh Thủ street (from Tô Ký to Lê Văn Khương)

3.     Location:

District 12

4.     Total land area:
5.     Project objective: Addressing the congestion and traffic accidents in the area
6.     The expected investment capital: 3,163
7.     General information on the project: Length: 4.7 km, width: 40m
8.     Form of investment: PPP
9.     Contact address:

Department of Transportation and Communication

10.             Notes (schedule, status):

 

1.     Project type:
2.     Project title:

Upgrading and expanding the district road 80B (from Nguyễn Ảnh Thủ to Lê Văn Khương)

3.     Location:

District 12, Hóc Môn District

4.     Total land area:
5.     Project objective: Addressing the congestion and traffic accidents in the area
6.     The expected investment capital: 463
7.     General information on the project: 4.3 km long, 20m wide
8.     Form of investment: PPP
9.     Contact address:

Department of Transportation and Communication

10.             Notes (schedule, status):

 

1.     Project type:
2.     Project title:

Construction of sidewalks, drainage system on Trans-Asia Road (section from An Sương to the beginning of Tây Ninh province)

3.     Location:

Dist. 12, Hóc Môn Province, Củ Chi

4.     Total land area:
5.     Project objective: Strengthening the transport capacity to serve the urbanization process
6.     The expected investment capital: 1,000
7.     General information on the project: 30km long, 40-42m wide
8.     Form of investment: PPP
9.     Contact address:

Department of Transportation and Communication

10.             Notes (schedule, status):

 

1.     Project type:
2.     Project title:

Construction of inter-ward road of Thới An Ward – Thanh Xuân Ward (route 2)

3.     Location:

District 12

4.     Total land area:
5.     Project objective: Addressing the congestion and traffic accidents in the area
6.     The expected investment capital: 1,760
7.     General information on the project: 4,507m long, 30m wide
8.     Form of investment: PPP
9.     Contact address:

Department of Transportation and Communication

10.             Notes (schedule, status):

 

1.     Project type:
2.     Project title:

Expanding and upgrading Lê Đức Thọ street (from Lê Văn Thọ street to Nguyễn Oanh street)

3.     Location:

Gò Vấp District

4.     Total land area:
5.     Project objective: Addressing the congestion and traffic accidents in the area
6.     The expected investment capital: 1,048
7.     General information on the project: 3.5km long, 25m wide
8.     Form of investment: PPP
9.     Contact address:

Department of Transportation and Communication

10.             Notes (schedule, status):

 

1.     Project type:
2.     Project title:

Construction of a steel overpass at the intersection of four communes

3.     Location:

Tân Bình District, Tân Phú District

4.     Total land area:
5.     Project objective: Addressing the congestion and traffic accidents in the area
6.     The expected investment capital: 934
7.     General information on the project: Thoại  Ngọc Hầu – Hương Lộ direction, 280m long,  9m wide in the first phase, in the second phase the same as around
8.     Form of investment: PPP
9.     Contact address:

Department of Transportation and Communication

10.             Notes (schedule, status):

 

1.     Project type:
2.     Project title:

Construction of steel overpass at Nguyễn Tri Phương – Ngô Gia Tự six-way intersection

3.     Location:

District 10

4.     Total land area:
5.     Project objective: Addressing the congestion and traffic accidents in the area
6.     The expected investment capital: 514
7.     General information on the project: Ngô Gia Tự street direction. Bridge length: 190.7m; width 1.9m in phase 1, and a similar bridge nearby in phase 2
8.     Form of investment: PPP
9.     Contact address:

Department of Transportation and Communication

10.             Notes (schedule, status):

 

1.     Project type:
2.     Project title:

Renovation and expansion of Linh Xuân overpass

3.     Location:

Thủ Đức District

4.     Total land area:
5.     Project objective: Addressing the congestion and traffic accidents in the area
6.     The expected investment capital: 400
7.     General information on the project: Tunnel from Kha Vạn Cân to Highway 1K, 6 lanes; renovation of the circle R = 22m, branches
8.     Form of investment: PPP
9.     Contact address:

Department of Transportation and Communication

10.             Notes (schedule, status):

 

1.     Project type:
2.     Project title:

Construction of the intersection for the route from Bà Chiêm Bridge to Hiệp Phước Industrial Park – Bến Lức Long Thành Expressway

3.     Location:

Nhà Bè District

4.     Total land area:
5.     Project objective: Addressing the congestion and traffic accidents in the area
6.     The expected investment capital: 1,800
7.     General information on the project:
8.     Form of investment: PPP
9.     Contact address:

Department of Transportation and Communication

10.             Notes (schedule, status):

 

1.     Project type:
2.     Project title:

Construction of Sác Forest Road – Bến Lức Long Thành Expressway

3.     Location:

Nhà Bè District

4.     Total land area:
5.     Project objective: Addressing the congestion and traffic accidents in the area
6.     The expected investment capital: 2,000
7.     General information on the project:
8.     Form of investment: PPP
9.     Contact address:

Department of Transportation and Communication

10.             Notes (schedule, status):

 

1.     Project type:
2.     Project title:

Renovation and expansion of Huỳnh Tấn Phát – Lưu Trọng Lư intersection

3.     Location:

District 7

4.     Total land area:
5.     Project objective: Addressing the congestion and traffic accidents in the area
6.     The expected investment capital: 450
7.     General Information on the project: Construction of 380m tunnel with 2 traffic lanes on Huỳnh Tấn Phát Street from Nhà Bè, Cần Giờ and the City Center. The beginning is 20 m prior to the center of Huỳnh Tấn Phát – Lưu Trọng Lư Intersection, and the end is 30 m from the center of Huỳnh Tấn Phát – Street 7 Intersection, with the length of guiding path on each side being 160m
8.     Form of investment: PPP
9.     Contact address:

Department of Transportation and Communication

10.             Notes (schedule, status):

 

1.     Project type:
2.     Project title:

Controlling erosion in Thanh Đa peninsula (section 3) (Bình Quới, Cây Bàng, Rạch Chùa)

3.     Location:

Bình Thạnh District

4.     Total land area:
5.     Project objective: Controlling river bank, canal bank erosion
6.     The expected investment capital: 999
7.     General Information on the project: 5.37km long
8.     Form of investment: PPP
9.     Contact address:

Department of Transportation and Communication

10.             Notes (schedule, status):

 

1.     Project type:
2.     Project title:

Controlling erosion of Tôm Canal (Phú Xuân Branch) from the head of Phú Xuân Rivulet Mouth to downstream for 1000m

3.     Location:

Nhà Bè District

4.     Total land area:
5.     Project objective: Controlling river bank, canal bank erosion
6.     The expected investment capital: 800
7.     General Information on the project: 300m long
8.     Form of investment: PPP
9.     Contact address:

Department of Transportation and Communication

10.             Notes (schedule, status):

 

1.     Project type: Entertainment – Public service
2.     Project name: Amusement and Public Service area

(Zone I – Ancient Zone, History – Ethnic Culture Park)

3.     Location: History – Ethnic Culture Park

Long Bình Ward, District 9, Hồ Chí Minh City

4.     Total land area: 6.5 ha
5.     Project objective: The project is arranged in the main axis of Hanoi Highway and North Ring Road to create the urban appearance for the road and meet the entertainment and public service demand of the residents in the area and the surrounding area.
6.     The expected investment capital: VND 380 billion
7.     General information on the project:

–         According to the Decision No. 687/QD-UBND dated 21/02/2009 of People’s Committee of Hồ Chí Minh City on approving the project of adjusting the construction planning, scale: 1/2000 of the History – Ethnic Culture Park

–         According to the Decision No. 215/QD-UBND dated 01/17/2017 of People’s Committee of Hồ Chí Minh City on approving the project of adjusting the detailed construction planning, scale: 1/500 for the Ancient Zone (Zone I) of the History – Ethnic Culture Park in District 9, Hồ Chí Minh City

+ Construction density: 10-20%

+ Density of trees, water: 60 -75%

+ Main traffic and yard density: 15 -20%

+ Minimum – maximum construction height: 01-02 floors

–         Construction items: Shopping, entertainment, restaurants, bars, clubs, sports boating, fishing, motels, gas stations, technical stations ….

8.     Form of investment:

– BOT, BCC, … and other forms as proposed by the investors.

9.     Contact: History – Ethnic Culture Park Management Board
10.             Notes (schedule, status):

 

1.     Project type: Physical training and sports
2.     Project name: Outdoor physical training and sports zone

(Zone IV – Living Activity Area of the History – Ethnic Culture Park)

3.     Location: History – Ethnic Culture Park

Long Bình Ward, District 9, Hồ Chí Minh City

4.     Total land area: 3.71 ha
5.     Project objective: The project is located next to the South Ring Road in order to diversify the sports, arts and cultural activities to enrich the cultural – historical sector of the Park, creating a sport zone with various types of sports, where comers can perform, compete, participate in healthy sports and entertainment activities, enjoy public cultural performances for residents in District 9 and attracts people to have fun in the Park
6.     The expected investment capital: VND 100 billion
7.     General information on the project:

–         According to the Decision No. 687/QD-UBND dated 21/02/2009 of People’s Committee of Hồ Chí Minh City on approving the project of adjusting the construction planning, scale: 1/2000 of the History – Ethnic Culture Park

–         According to the Decision No. 2485/SQHKT-QHC dated 20/06/2016 of the Department of Planning – Architecture on adding the land use functions and adjusting planning – architectural targets in Zone IV – History – Ethnic Culture Park, Long Bình ward, District 9, Hồ Chí Minh City.

+ Building density: 15%

+ Density of trees, water: 60 -75%

+ Main traffic and yard density: 15 -20%

+ Minimum – maximum construction height: 03 floors

–         Construction items: Outdoor Sports and Gym Zone, arena, tennis courts, beverage service and catering sector, technical area

 

8.     Form of investment:

– BOT, BCC, … and other forms as proposed by the investors.

9.     Contact: History – Ethnic Culture Park Management Board
10.             Notes (schedule, status):

 

1.     Project type: Culture – History
Project name: Trường Sơn Forest Representation Park

(Zone IV – Cultural Activity Area of the History – Ethnic Culture Park)

2.     Location: History – Ethnic Culture Park

Long Bình Ward, District 9, Hồ Chí Minh City

3.     Total land area: 20.19 ha
4.     Project objective: The project is located in the hills south of the Park, where to plant and reconstruct part of Trường Sơn Forest, typical roads, bases and places associated with the history on Hồ Chí Minh trail during the anti-American period to educate about the nation’s history for visitors, ….
5.     The expected investment capital: VND 120 billion
6.     General information on the project:

–         According to the Decision No. 687/QD-UBND dated 21/02/2009 of People’s Committee of Hồ Chí Minh City on approving the project of adjusting the construction planning, scale: 1/2000 of the History – Ethnic Culture Park

–         According to the Decision No. 2485/SQHKT-QHC dated 20/06/2016 of the Department of Planning – Architecture on adding the land use functions and adjusting planning – architectural targets in Zone IV – History – Ethnic Culture Park, Long Bình ward, District 9, Hồ Chí Minh City.

+ Building density: 10%

+ Density of trees, water: 60 -75%

+ Main traffic and yard density: 15 -20%

+ Minimum – maximum construction height: 02 floors

–         Construction item: Center area, Trường Sơn Forest Representation Zone, reconstruction of landmarks associated with the history on Hồ Chí Minh Trail, outdoor service and camping area, administrative areas and technical service zone, …

 

7.     Form of investment:

– BOT, BCC, … and other forms as proposed by the investors.

8.     Contact: History – Ethnic Culture Park Management Board
9.      Notes (schedule, status):

 

1.     Project type: Culture – History
Project name: Vietnam Ethnic Culture Village Zone

(Zone IV – Cultural Activity Area of the History – Ethnic Culture Park)

2.     Location: History – Ethnic Culture Park

Long Bình Ward, District 9, Hồ Chí Minh City

3.     The total area of ​​the land: 42.0 ha
4.     Project objective: The project is located in the hills south of the Park, is one of the important areas in Zone IV of the History – Ethnic Culture Park. The aim is to reproduce, preserve, promote and exploit the cultural heritages of the community of 54 ethnic groups in Vietnam, to introduce to people throughout the country and the world, to meet the needs of healthy entertainment through arts, cultural and culinary activities typical of the ethnic peoples. In this area, the planning shows traditional living space, recreates the community living space, labor and production space, festive culture space, natural environment and landscape. It also recreates the image of traditional houses, public and religious works typical of each ethnic group.
5.     The expected investment capital: VND 50 billion
6.     General information on the project:

–         According to the Decision No. 687/QD-UBND dated 21/02/2009 of People’s Committee of Hồ Chí Minh City on approving the project of adjusting the construction planning, scale: 1/2000 of the History – Ethnic Culture Park

–         According to the Decision No. 2485/SQHKT-QHC dated 20/06/2016 of the Department of Planning – Architecture on adding the land use functions and adjusting planning – architectural targets in Zone IV – History – Ethnic Culture Park, Long Bình ward, District 9, Hồ Chí Minh City.

+ Building density: 15%

+ Density of trees, water: 60 -75%

+ Main traffic and yard density: 15 -20%

+ Minimum – maximum construction height: 03 floors

–         Construction item: The Square and Center of the Park for general introduction, the Area to recreate ethnic groups by region (including housing, production areas, festive activity area, traditional production area), food and service area, governance and technical areas, internal roads and grounds, …

 

7.     Form of investment:

– BOT, BCC, … and other forms as proposed by the investors.

8.     Contact: History – Ethnic Culture Park Management Board
9.      Notes (schedule, status):

 

1.     Project type: Culture – History
Project name: Cinema Park

(Zone IV – Cultural Activity Area of the History – Ethnic Culture Park)

2.     Location: History – Ethnic Culture Park

Long Bình Ward, District 9, Hồ Chí Minh City

3.     Total land area: 23.28 ha
4.     Project objective: The project is located in the Southwest of the Park, bordering the South Ring Road and Hàng Tre Road in order to create a novelty theme park for the City people, and also create conditions for Vietnam’s cinema to develop and approach the public more vividly. The Cinema Park has the function of introducing Vietnam’s cinema and organizing activities in the fields of cinema, cinema techniques, providing services for the film crews. This is also where to organize exchanges among actors and the public, hold fun and entertainment activities, … and cinema activities.
5.     The expected investment capital: VND 500 billion
6.     General information on the project:

–         According to the Decision No. 687/QD-UBND dated 21/02/2009 of People’s Committee of Hồ Chí Minh City on approving the project of adjusting the construction planning, scale: 1/2000 of the History – Ethnic Culture Park

–         According to the Decision No. 2485/SQHKT-QHC dated 20/06/2016 of the Department of Planning – Architecture on adding the land use functions and adjusting planning – architectural targets in Zone IV – History – Ethnic Culture Park, Long Bình ward, District 9, Hồ Chí Minh City.

+ Building density: 20%

+ Density of trees, water: 60 -75%

+ Main traffic and yard density: 15 -20%

+ Minimum – maximum construction height: 05 floors

–         Construction item: The Center zone includes the traditional houses, exhibition houses, theaters, …; internal scene studio, montage technique area; External scene studio area, landscape forest; real and miniature modeling area; amusement area, children’s area, swimming pools, performances and services; auxiliary works area (administrative area, management house, warehouse, engineering works); Traffic and parking area.

7.     Form of investment:

– BOT, BCC, … and other forms as proposed by the investors.

8.     Contact: History – Ethnic Culture Park Management Board
9.      Notes (schedule, status):

 

1.     Project type: Culture – History
Project name: Adventure Park and Peace Square

(Zone IV – Cultural Activity Area of the History – Ethnic Culture Park)

2.     Location: History – Ethnic Culture Park

Long Bình Ward, District 9, Hồ Chí Minh City

3.     Total land area: 8.08 ha
4.     Project objective: The project is located in the Southwest of the Park adjoining Đồng Nai river and the Village Road No. 33 (in the future it will be the Ring Road 3), forming 01 park with thrilling games for teenagers, linking space with mineral spring resort, forming a major tourist complex complete with various types of diverse entertainment. Especially in this area it is expected to arrange a Peace Square; on the historical significance, this is the result of a process of arduous struggle over the periods from the time of founding the nation (Ancient Zone) to the times against foreign invaders for national freedom and independence (Middle Age and Near modern Zones). In terms of function: this is the area for fun of the people in the region, where to organize outdoor festivals, fireworks, kite flying, cultural and art activities… and where to welcome visitors to the History – Ethnic Culture Park by boats on Đồng Nai River. In terms of landscape, the layout creates open space toward Đồng Nai River.
5.     The expected investment capital: VND 430 billion
6.     General information on the project:

–         According to the Decision No. 687/QD-UBND dated 21/02/2009 of People’s Committee of Hồ Chí Minh City on approving the project of adjusting the construction planning, scale: 1/2000 of the History – Ethnic Culture Park

–         According to the Decision No. 2485/SQHKT-QHC dated 20/06/2016 of the Department of Planning – Architecture on adding the land use functions and adjusting planning – architectural targets in Zone IV – History – Ethnic Culture Park, Long Bình ward, District 9, Hồ Chí Minh City.

+ Building density: 15%

+ Density of trees, water: 60 -75%

+ Main traffic and yard density: 15 -20%

+ Minimum – maximum construction height: 05 floors

–         Construction item: Peace Square Zone; Statue garden; Thrilling game parks, recreation areas for children; Tourist service zone; Downtown; River travel harbor; Internal roads and parking areas, …

7.     Form of investment:

– BOT, BCC, … and other forms as proposed by the investors.

8.     Contact: History – Ethnic Culture Park Management Board
9.      Notes (schedule, status):

 

1.     Project type: Entertainment – Public service
Project name: Public service zone

(Zone IV – Cultural Activity Area of the History – Ethnic Culture Park)

2.     Location: History – Ethnic Culture Park

Long Bình Ward, District 9, Hồ Chí Minh City

3.     Total land area: 5.23 ha
4.     Project objective: The project is located at Nguyễn Xiển and South of the Park road intersection, convenient for transportation and not affecting operations in the Park. The project includes commercial area, food and beverage service area, indoor refreshment and entertainment areas, … to serve and meet daily needs of visitors to the Park and local residents.
5.     The expected investment capital: VND 100 billion
6.     General information on the project:

–         According to the Decision No. 687/QD-UBND dated 21/02/2009 of People’s Committee of Hồ Chí Minh City on approving the project of adjusting the construction planning, scale: 1/2000 of the History – Ethnic Culture Park

–         According to the Decision No. 2485/SQHKT-QHC dated 20/06/2016 of the Department of Planning – Architecture on adding the land use functions and adjusting planning – architectural targets in Zone IV – History – Ethnic Culture Park, Long Bình ward, District 9, Hồ Chí Minh City.

+ Building density: 20%

+ Density of trees, water: 60 -75%

+ Main traffic and yard density: 15 -20%

+ Minimum – maximum construction height: 05 floors

–         Construction item: Includes commercial buildings (shopping, marketing, introduction of cultural products, tourism products, traditional products, local products to visitors), dining area, entertainment area; Parking lot,…

7.     Form of investment:

– BOT, BCC, … and other forms as proposed by the investors.

8.     Contact: History – Ethnic Culture Park Management Board
9.      Notes (schedule, status):

 

1.     Project type: Culture – History
Project name: Mineral spring tourism flower village

(Zone IV – Cultural Activity Area of the History – Ethnic Culture Park)

2.     Location: History – Ethnic Culture Park

Long Bình Ward, District 9, Hồ Chí Minh City

3.     Total land area: 16.51 ha
4.     Project objective: The project is located East of the Park, one side adjacent to Đồng Nai River, the rest contiguous to Nguyễn Xiển street (Ring Road 3 in the future). The flower village is where to grow, produce, display and trade all kinds of traditional and modern flowers and ornamental fish; to host exhibition, seminars, training sessions and exchanges to support the movement of cultivating bonsai and transfer of technology to produce ornamental fish and flower, and ornamental plant. In addition, to create the diversity and abundance for recreation and resting in the History – Ethnic Culture Park, the mineral spring resort is where to provide the visitors with services of offset bathing, hot mineral spring, nursing, physiotherapy … Once formed, this resort is the first to exploit this type of services in Hồ Chí Minh City.
5.     The expected investment capital: VND 400 billion
6.     General information on the project:

–         According to the Decision No. 687/QD-UBND dated 21/02/2009 of People’s Committee of Hồ Chí Minh City on approving the project of adjusting the construction planning, scale: 1/2000 of the History – Ethnic Culture Park

–         According to the Decision No. 2485/SQHKT-QHC dated 20/06/2016 of the Department of Planning – Architecture on adding the land use functions and adjusting planning – architectural targets in Zone IV – History – Ethnic Culture Park, Long Bình ward, District 9, Hồ Chí Minh City.

+ Building density: 20%

+ Density of trees, water: 60 -75%

+ Main traffic and yard density: 15 -20%

+ Minimum – maximum construction height: 05 floors

–         Construction item: The flower village includes several central buildings, tea zone, seed bank, artist clubs, nursery and ancillary works, shops, Kiosks, …; the mineral spring resort includes works of reception area, administrative area, physiotherapy, pool area (mineral pool spa, pool for children, pool for training and hot and cold waterfall), mud bathing area, premium area, restaurants, resorts and other ancillary works, …

7.     Form of investment:

– BOT, BCC, … and other forms as proposed by the investors.

8.     Contact: History – Ethnic Culture Park Management Board
9.      Notes (schedule, status):

 

1.     Project type: Business service
Project name: low-rise resort buildings

(Zone IV – Cultural Activity Area of the History – Ethnic Culture Park)

2.     Location: History – Ethnic Culture Park

Long Bình Ward, District 9, Hồ Chí Minh City

3.     Total land area: 8.06 ha
4.     Project objective: The project is located East of the land plot, next to Đồng Nai River, uses the riverbank position to create landscape on the river, very favorable for yacht service, resort, … This area has low building density, creates more green space and sports works serving the residential area. This zone is considered the place of rest, recuperation ideal for visitors to have fun, entertainment and stay at the Park with many relaxing services, utilities.
5.     The expected investment capital: VND 500 billion
6.     General information on the project:

–         According to the Decision No. 687/QD-UBND dated 21/02/2009 of People’s Committee of Hồ Chí Minh City on approving the project of adjusting the construction planning, scale: 1/2000 of the History – Ethnic Culture Park

–         According to the Decision No. 2485/SQHKT-QHC dated 20/06/2016 of the Department of Planning – Architecture on adding the land use functions and adjusting planning – architectural targets in Zone IV – History – Ethnic Culture Park, Long Bình ward, District 9, Hồ Chí Minh City.

+ Building density: 30%

+ Density of trees, water: 60 -75%

+ Main traffic and yard density: 15 -20%

+ Minimum – maximum construction height: 04 floors

–         Construction item: Low-rise riverside rest houses, swimming pools, sports grounds, sports works to serve residential areas, ….

7.     Form of investment:

– BOT, BCC, … and other forms as proposed by the investors.

8.     Contact: History – Ethnic Culture Park Management Board
9.      Notes (schedule, status):

 

1.     Project type: Business service
Project name: Cable car – riverside cuisine area

(Zone IV – Cultural Activity Area of the History – Ethnic Culture Park)

2.     Location: History – Ethnic Culture Park

Long Bình Ward, District 9, Hồ Chí Minh City

3.     Total land area: 3.17 ha
4.     Project objective: The project is located on both sides of Nguyễn Xiển street (Ring Road 3 in the future) and near Đồng Nai River, so it is very convenient for transportation with open space, very convenient for travel services, shopping, dining, sports, …
5.     The expected investment capital: VND 130 billion
6.     General information on the project:

–         According to the Decision No. 687/QD-UBND dated 21/02/2009 of People’s Committee of Hồ Chí Minh City on approving the project of adjusting the construction planning, scale: 1/2000 of the History – Ethnic Culture Park

–         According to the Decision No. 2485/SQHKT-QHC dated 20/06/2016 of the Department of Planning – Architecture on adding the land use functions and adjusting planning – architectural targets in Zone IV – History – Ethnic Culture Park, Long Bình ward, District 9, Hồ Chí Minh City.

+ Building density: 20%

+ Density of trees, water: 60 -75%

+ Main traffic and yard density: 15 -20%

+ Minimum – maximum construction height: 02 floors

–         Construction item: Cable car system area, souvenir stores, convenience stores; Riverside dining areas; Central operating area; Sports and gym area; Resort; Green isolation zone; Technical infrastructure area, parking lot, …

7.     Form of investment:

– BOT, BCC, … and other forms as proposed by the investors.

8.     Contact: History – Ethnic Culture Park Management Board
9.      Notes (schedule, status):

 

1.     Project type: Culture – History
Project name: Flower garden area

(Zone IV – Cultural Activity Area of the History – Ethnic Culture Park)

2.     Location: History – Ethnic Culture Park

Long Bình Ward, District 9, Hồ Chí Minh City

3.     Total land area: 5.53 ha
4.     Project objective: The project is located South of the Park, is the area combined with the landscape of Bửu Long Pagoda, separated from the land of Vietnamese Ethnic Culture Village with various types of flowers, ornamental plants, pavilions, ponds, services for tourists, …
5.     The expected investment capital: VND 100 billion
6.     General information on the project:

–         According to the Decision No. 687/QD-UBND dated 21/02/2009 of People’s Committee of Hồ Chí Minh City on approving the project of adjusting the construction planning, scale: 1/2000 of the History – Ethnic Culture Park

–         According to the Decision No. 2485/SQHKT-QHC dated 20/06/2016 of the Department of Planning – Architecture on adding the land use functions and adjusting planning – architectural targets in Zone IV – History – Ethnic Culture Park, Long Bình ward, District 9, Hồ Chí Minh City.

+ Building density: 10%

+ Density of trees, water: 60 -75%

+ Main traffic and yard density: 15 -20%

+ Minimum – maximum construction height: 01 floor

–         Construction item: planting flowers, ornamental plants, pavilions, ponds, services for tourists, …

7.     Form of investment:

– BOT, BCC, … and other forms as proposed by the investors.

8.     Contact: History – Ethnic Culture Park Management Board
9.      Notes (schedule, status):

 

Download: English file

Contact us for more information:

KHV CONSULTING CO.,LTD

Office:        23 Đường số 7 CityLand Park Hills, Phường 10, Q.Gò Vấp, TP.HCM
Hotline:        0903.349.539
Email:           contact@khv.vn

Trả lời

Email của bạn sẽ không được hiển thị công khai. Các trường bắt buộc được đánh dấu *